My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6474
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7499
>
Reso 6400 - 6499 May 12, 2014 - April 27, 2015
>
Resolution 6474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2021 9:18:56 AM
Creation date
10/20/2015 1:29:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i • <br /> ��� YO <br /> C ITY OF �RONO <br /> RESOLUT'ION OF THE CITY COUNCIL <br /> ��'�, �,G~ N o. 6 4 7 4 <br /> kFsxo� <br /> 17. Applicants shall comply with all recommendations of the City Staff and City Engineer <br /> with regard to site cleanup and restoration, including but not limited to contaminated soil <br /> removal,junk and debris removal, etc. <br /> 18. Development Fees. Applicants are advised of the following development fees to be paid <br /> in full at the time of final plat approval: <br /> A. Park Dedication Fee. The development is subject to the standard Park Dedication <br /> Fee requirement. Because the value of each newly created lot will be in excess of <br /> the threshold value of $69,375.00 the 8% park fee cap of $5,550 per lot will <br /> apply. Park dedication fee will be 461ots x $5,550 = $255,300. <br /> B. Storm Water and Draina�e Trunk Fee. The development will subject to the Storm <br /> Water and Drainage Trunk Fee- Amount To Be Determined Prior to Final Plat <br /> Approval. <br /> 20. Plans and Specifications. Applicants are advised that the following plans and <br /> specifications shall be submitted for review and approval by the City and other <br /> appropriate jurisdictions prior to final plat approval, to ensure that the proposed plat will <br /> accomplish the intended purposes: <br /> a) Final overall layout for all primary and alternate sewage treatment system sites <br /> and proposed well locations. <br /> b) Final grading, drainage and erosion control plan showing existing and proposed <br /> contours, anticipated building locations, elevations, stormwater facilities and <br /> calculations, utilities and erosion control measures to be used during construction. <br /> Final Plat Approval will not be granted until the Minnehaha Creek Watershed <br /> District has approved the stormwater management plans. <br /> c) Conservation/Preservation areas plan depicting all areas subject to protective <br /> covenants and easements. <br /> d) Engineering details and design for any proposed retaining walls. <br /> e) Road construction plans including proposed plan and profile views, typical street <br /> section, geotechnical report, R-value recommendation and pavement design. <br /> fl Sufficient additional detail to meet the recommendations of the City Engineer. <br /> Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.