My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-1992 Council Packet
Orono
>
City Council
>
1992
>
08-24-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 3:01:59 PM
Creation date
4/9/2024 2:58:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
proiect. It was moved by Manager Love and seconded by Manager <br />LaBounty that the permit be approved and issued upon receipt by <br />the Engineer of documentation of project review and approval by <br />the City of Plymouth. Upon vote* the project carried unanimously. <br />Q2-127. Mariorv Davis and Martha Johnson — 5MB ChQMCtt <br />Avenue Snii«-h. Edina. MM. shoreline inetallation of 93 lineal <br />rip ran for shoreline protection along Minnehaha CrefilU <br />The Engineer recommended approval pending receipt of those <br />items set forth in the Engineer's report. It was moved by Manager <br />Love, seconded by Manager Thomas that the permit be approved with <br />issuance pending receipt of those items as set forth in the <br />Engineer's report in a form and substance acceptable to the <br />Engineer. Manager LaBounty expressed his concern <br />applications which have not been signed. He also questioned the <br />Engineer concerning the construction of the <br />would require a variance from normal slope requirements. Manager <br />LaBounty stated that there appeared to be a lack . <br />for this project to date. Manager Erickson also indicated that he <br />was very concerned about the slope of the project and expressed a <br />need to review the matter in more detail at the next meeting. <br />Based upon these comments* Manager Love withdrew his motion, it <br />was moved by Manager LaBounty and seconded by Manager Erickson <br />that permit applications No. 92-127 «.nd 92-128 (Peter Randall* <br />5612 Chowen Avenue South* Edina* installation of 95 J®®^ ® <br />rip rap for shoreline erosion protection) be tabled. Upon vote <br />the motion carried* with Manager Thomas voting against the motion. <br />Q2-ns. Thompson Land Development — LtOTB MaMqfiBent <br />plan frir oradina for Phase 3 of the BridalMQOfl f«P <br />ritv of Plymouth. <br />I Addition <br />seconded by Manager Love that the permit be <br />recommendation of the Engineer. Upon vote* the motion carried <br />unanimously. <br />09-190. Thn Marsh — stom water managcragnt plan for building <br />iA"%"S.nsinn forthe Mamli Fitneffff Centat. CUg-Stt <br />Minnetonka. <br />ird UinutM -5-(07/1S/92> <br />.L-
The URL can be used to link to this page
Your browser does not support the video tag.