Laserfiche WebLink
■■■ <br />mi'.. <br />Ipt-J;<> ■ * <br />O:-? <br />'it. <br />^ :?■ ^ <br />Vi <br />i.. <br />. ‘^ *- :. <br />a;u <br />■■ <br />1.6.4 <br />1.7 <br />1.7.1 <br />1.7.2 <br />1.8 <br />1.8.1 <br />1.8.2 <br />2.1 <br />2.1.1 <br />2.1.1.1 <br />;••./ <br />Quiqua itv Controity contro The successful bidder shall submit a copy of the <br />program which Is used to manufacture their particular <br />floating pier system. The quality control program submitted by the <br />manufacturer will be used by the project engineer to establish his/her <br />inspection schedule and testing requirements to insure compliance with <br />the plans and specifications particularily in the following areas; <br />a. <br />b. <br />c. <br />d. <br />e. <br />Weld quality. <br />Certifications for materials such as steel, galvanizing, wood, <br />wood treatment, bolts and fasteners, floatation, and floatation <br />encasement. <br />Dimensional inspection. <br />Galvanizing <br />Quality of floatation material • and encasement during <br />manufacturing. <br />PRODUCT HANDLING <br />Protection; Use all means necessary to protect the materials of <br />this Section before, during and after installation and to protect <br />the work and materials of all other trades. <br />Replacements: In the event of damage, immediately make all repairs <br />and replacements necessary to the approval cf the Engineer and at no <br />additional cost to the Owner. <br />CONDUIT AND PIPING IDENTIFICATIONS (If Applicable) <br />All conduit and piping installed in the floating piers shall be <br />designated by painted stencil marking indicating its respective use <br />and/or purpose, e.g., electrical power, lighting, water, gasoline, <br />diesel fuel, sanitary, phone or cable television. Conduit and <br />piping shall be marked at all access locations. <br />All deck mounted accessories shall be bolted to or through the pier <br />frame. Additional and/or intermediate members may be required to <br />accommodate adequate bolting of deck mounted power centers, lighting <br />units, gasoline and diesel dispensers, pump-out units, etc. <br />MATERIALS <br />Uunbfir: <br />Decking lumber shall be No. 1 select structural Southern Yellow Pine <br />or better and shall conform to the rules of the SPIB as applicable. <br />Framing lumber shall be No. 1 Southern Yellow Pine or better, and <br />shall conform to the rules of the SPIB. Timber and lumber shall be <br />pressure treated with chromated copper arsenate preservative in <br />accordance with AWPB Standard LP-22 and each piece shall bear the <br />AWPA Quality Nark. <br />• 8 <br />- <br />• t .