My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-1992 Council Packet
Orono
>
City Council
>
1992
>
08-10-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 1:23:50 PM
Creation date
4/8/2024 1:20:00 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■V ^ <br />.rr-i’ . <br />1.5.1 <br />1.5.2 <br />1.5.3 <br />1.6 <br />1.6.1 <br />1.6.2 <br />1.6.3 <br />Abbreviations: Reference is made in theses specifications to the <br />codes and/or standards promulgated by the following agencies and <br />organizations: <br />ASCE <br />ASTM <br />AWPA <br />AWPB <br />AWS <br />LWD <br />SPIB <br />American Society of Civil Engineers, 345 East 47th Street, New <br />York, N.Y. 10017 <br />American Society for Testing and Materials, 1916 Race <br />Street, Philadelphia, Pennsylvania 19103 <br />American Wood Preservers Association <br />American Wood Preservers Bureau, P.O. Box 6085, Arlington, <br />Virginia 22206 <br />American Welding Society, Inc., 2501, N.W. 7th Street, <br />Miami, Florida 33125 <br />Low Water Datum <br />Southern Pine Inspection Bureau <br />Comoliance: Comply with those codes and/or standards specified in <br />this Section and referenced above. <br />Conflicts: In case of conflict between the referenced codes and/or <br />standards, the most stringent requirements shall govern. <br />SUBHIHALS <br />Shop Drawings: The successful bidder shall be required to submit <br />six (6) complete sets of detailed shop drawings of the complete pier <br />system that was pre-qualified to the Engineer for approval prior to <br />fabrication of the required floating pier system. The shop drawings <br />shall show all dimensions, clearances, and anchorage locations. If <br />utilities are included, drawings shall show the location of utilities <br />including electrical conduit and junction boxes; waterlines, <br />crossovers, risers and valves; fuel lines; forcemains; telephone and <br />television conduit; and other required components including method/s <br />of attachment. The detailed shop drawings shall bear the seal of a <br />professional engineer registered to practice in the state of Michigan <br />who is experienced in the design of floating structures, anchorages <br />and related appurtenances. In addition, if design calculations for <br />this specific project as described in 1.2.2.5 were not previously <br />submitted during prequalification as similar type calculations were <br />substituted, at the discretion of the engineer, six copies of said <br />calculations may be required along with the shop drawings. <br />Construction Sequence: <br />submit a construction <br />time schedule. <br />The successful bidder shall be required to <br />sequence schedule as well as a construction <br />Record Drawings: At the completion of the work the successful bidder <br />shall provide the Engineer with reproducible drawings of the floating <br />pier system installation incorporating all changes made during the <br />construction and installation process. <br />- 7 -
The URL can be used to link to this page
Your browser does not support the video tag.