Laserfiche WebLink
:i <br />1.1 <br />1.1.1 <br />1.1.2 <br />1.1.3 <br />1.1.4 <br />1.2 <br />1.2.1 <br />W: <br />Floating Pier Specification Revision Copy December 1990 <br />DESCRIPTION <br />Work Included: Design, fabricate, install and furnish all plant, <br />labor, equipment, supplies and materials and perform all operations <br />required for installation of a complete, fully functional and <br />operational floating pier system, including but not necessarily <br />limited to head piers, finger piers, bridges, anchorages, and <br />(Describe utilities and appurtenances included as part of the Floating <br />Pier system, if applicable) all as indicated on the drawings and as <br />specified herein. <br />Contract Orawinos. The contract drawings are general in nature and <br />show basic floating pier layout with required dimensions, required <br />cleat and fender locations, and certain required materials and details <br />of construction. The piers shown on the drawings are patterned after <br />the type manufactured by _ _ _ _ _ _ _ _ _ _ _, of _ _ _ _ _ _ _ _ _ _. <br />However, the intent is not to preclude other pier systems of different <br />manufacture as long as they meet the required design loads, are within <br />the range of required dimensions, are constructed with the specified <br />materials, and are of a quality equal to or better than that specified <br />in this Section. <br />Fabrication. The contract drawings are not intended to be used for <br />fabrication. The Contractor shall prepare and submit at least <br />sets of drawings to the Engineer for approval prior to fabricating and <br />installing the required pier system. <br />Other Materials and Equipment. Other materials and equipment shall be <br />as indicated on the Drawings, however, all other materials not <br />specifically described but required for a complete and proper <br />installation of the work under this Section, shall be new, first <br />quality, and as selected by the Contractor subject to the approval of <br />the Engineer. <br />QUALITY ASSURANCE OF AN ACCEPTABLE FLOATING PIER SYSTEM <br />Qualification of the Bidder: Each prospective bidder planning to <br />submit a proposal for this project shall submit four copies of a <br />pre-qualification package to the Engineer no later than_ _ _ _weeks <br />prior to bid opening for the purpose of obtaining pre-bid <br />qualifications of the floating pier system they manufacture including <br />the anchorage system specified. It is the intent of prequalification <br />for prospective bidders to provide the engineer with sufficient <br />information to determine whether the requirements of these specifica­ <br />tions as well as the project drawings can be met if the proposed <br />floating pier system being evaluated is selected through the competi­ <br />tive bidding process. A minimum of five (5) years of proven ex­ <br />perience in floating pier system fabrication and installation is <br />required. <br />- 1 -