Laserfiche WebLink
pi'UiA.;, <br />m-‘^ ■ <br />V 5. <br />r^ <br />%^- <br />CTv'i. <br />il : *\ .:- 4- ■ * <br />"v -, »; <br />^?^V; ■ <br />V%T section 10.56, Subd. 16 (C) (1), all existing structures <br />on Lot 1 aeet the required 100* setback from the protected <br />tributary. The existing septic system on Lot 1 and proposed <br />new septic systems meet the required 75* setback from the <br />protected tributary. <br />«•Per Section 10.56, Subd. 8 (B) and Subd. 16 (L), all new <br />construction will be subject to the new setback standards <br />for shoreland areas and all areas within 300* of the <br />tributary are subject to the appropriate hardcover controls. <br />iM- <br />■OWf TBBIBFOKB Ml I'T RK80LVBD, that based upon either one or <br />More of the findings noted aoove, the City Council '•f the City of <br />OroBO hereby approves the prelisiinary plat for James ?. Lawrence per <br />the survey dated June 24, 1992, revised July 13, 1992, by Mark S. <br />Qronberg of Coffin and Gronberg, Inc., subject to the following <br />oonditions t <br />V M 1. <br />’■-i ■ <br />Applicant to grant a drainage easement over the pond on Lot <br />1. <br />fc*-2e Prior to final plat app..o/al, subdivider shall provide <br />written documentation confirming that Lot 2 will be governed <br />by all current covenants and agreements involving road <br />maintenance and maintenance of other shared improvements for <br />the Tanglewood Plat. <br />3. <br />ill <br />Prior to the issuance of a building permit for new <br />construction on Lot 2, the alternate drainfield site must be <br />staked and protected prior to any land alterations on the <br />property. <br />4.Access to Lot 1 shall remain via Tract E of RLS #1418 and <br />access to Lot 2 shall be via Tanglewood Road. Future owner <br />of Lot 2 must obtain a permit from the Public Works Director <br />for the installation of a curb cut onto Tanglewood Road. <br />5.Lot 1 is classified as a through lot. Owner is hereby <br />advised that a conditional use permit is required for the <br />construction of all future accessory structures. <br />Pa^ 2 of 4 <br />i?s- <br />i <br />1