My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-08-1992 Council Packet
Orono
>
City Council
>
1992
>
06-08-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2024 11:30:42 AM
Creation date
3/29/2024 11:27:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
s <br />MINUTES OF THE PARK COMMISSION MEETING OF APRIL 6, 1992 <br />Bonlen stated that she was .n attendance <br />to ensure natural vegetation would be protected along the trail. <br />She stated that residents do want to have nore trail systems. <br />White stated that It is possible the trail could be started this <br />sSmm^ bSt probably would not be realized within the sumiee'- of <br />1992. He asked that the City make a recommendation on the trail <br />within 60 days. <br />Use asked If all affected residents were Informed. <br />rerhardson noted all residents along the trail to Noerenberg Park <br />:::*H;rer:r-it Ts rii‘^ti?e%°"ci;s\°'’toTh:rr''p*?ope%'t;:* <br />rrAia Brandenburg, 2775 Sliver View Drive, asked where the <br />aSdlllonaT drainage would go, and noted additional water could <br />create quite a problem for a parcel. <br />Gerhardson noted It would go by pipe rather than <br />ralIroad right-of-way. It could be connected to ex 1stIng culverts. <br />^hirSould have to be addressed If the trail is aoprov.sd. <br />Chair Flint thanked the residents for their input on this matter. <br />He expressed appreciation for the large turn-out. <br />Johnston asked what the amount of the drainage costs would be. <br />Wilson wasn’t clear If the County would pay for the screening along <br />the traiI. <br />Johnston noted the amount quoted for the project 'f <br />iox higher than the average cost of a trail. ^e^y <br />th^ same cost as the additional acquisition <br />is expecting the City to pay for the storm sewer if that Is the <br />option that Is approved. <br />from Council of the entire project. A feasibl y <br />required to use the MSA funds. <br />It was moved by Use. seconded by <br />!?rrrLM^?.*h'a1^Sl^%lo‘nL\r''e»t llde of Old Crystal Bay <br />eRoad.
The URL can be used to link to this page
Your browser does not support the video tag.