My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-1992 Council Packet
Orono
>
City Council
>
1992
>
04-13-1992 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:27:16 AM
Creation date
3/12/2024 10:23:16 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I'• <br />p-m <br />^i- <br />’€■fe <br />IS.. •. <br />myw <br />%^ife'M?- <br />hi' <br />St <br />i$y. <br />Myy <br />Sf:lf <br />.•f.i&S <br />f>^ <br />p. <br />m.Wm <br />CITY of ORON <br />Munictpii Offkcs <br />Post OfiWt Box 66 <br />Cn stal Bav, Nlinnevna 55323-0066 <br />TELEPHONE - 473.7357 • F v\ 473^0510 <br />STUBBS BAY SEWER PROJECT <br />I. Defining the Need <br />Recent State requireirents have resulted in an update of <br />Orono's septic system ordinance to be in compliance <br />with DNR Shcreland Regulations as well as MPCA minimum <br />requirements. <br />A significant ramification of the new requirements is <br />that many existing trench-type drainfields located in <br />seasonally saturated soils (less than 3' above zones of <br />soil mottling) will be reclassified as non-conforming <br />and must be replaced. Once reclassification occurs, <br />non-conforming systems must be replaced with fully <br />conforming systems within one year. <br />The DNR Shoreland Regulations leave the City with <br />little leeway in enforcing septic requirements. <br />Orono’s recent policy in the Stubbs Bay Area of <br />allowing "minimal repairs until sewer comes", is at an <br />end. <br />A recent inspection update and more detailed analysis <br />of individual site constraints indicates that: <br />- Of 127 existing residences, at least 18 currently <br />have failing systems. <br />- 78 of 127 do not appear to have an acceptable <br />system replacement site available if/when the <br />existing septic system needs to be replaced. <br />- For those which have a site available for system <br />replacement, in virtually all cases a "mound" cype <br />drainfield will be required based on anticipated <br />soil conditions.
The URL can be used to link to this page
Your browser does not support the video tag.