Laserfiche WebLink
^ . • •«. . • . .^ ‘ • ...........-*• - ^ *'. vf.>-'AV‘v .»- •- -s^*‘Hr".**’? 'f'-wrvrr^t 'twtf <br />// • - •. »,,• .- -r <br />»- -^ ■ -- 1 *VmmAmm <br />,. -. >.^*-*^. *•« <br />ci;- <br />fi,- ■•^. <br />m <br />fcr * ’M* <br />?'■Si V' -i\..*.,'f <br />IW V ri*. <br />’’ ' •*>'w- ^ . "-I <br />\4;r> <br />* <br />1" <br />'♦• “ <br />► <br />Sa'»-‘ ‘ .5 ” <br />%*.'.■,/S' <br />':--l-'A:CHi <br />‘fm.r*-. <br />m\ '■>*;«!-V r i.’ ', I, <br />I %if? ••; <br />Kf'^. ,^h <br />‘V^. <br />m <br />■' I <br />¥m <br />wml <br />'i. <br />fe'^'j <br />u'^ :* ^ ^.• • <br />■/*• <br />*• \p« <br />City of onorvo -:r <br />w.wm RESOLUTION OE THE CtTV COUNCIL <br />NO. <br />!• Prior to the haulina of fill to the slte» the applicant or <br />applicant’s agent must submit the following; <br />A) <br />B) <br />Six cross sections of existing topography. <br />Pinal gra<?lng and erosion plan designating the following: <br />i. Side slopes 5:1 ratio; <br />il. 1% slope to be maintained within inner fill area; <br />iii. Silt fence installed 30-35' from wetland at 972 <br />elevation - no land alteratijns allowed within 26* o£ <br />wetland; <br />C) Executed developer's agreement and appropritte security to <br />ensure final grading and seeding if fill project is not <br />completed. <br />2« Pill shall not exceed allowed amount of lOO^OCO cubic yards* <br />Average height of fill to be maintained at 5'. Side slopes to bo <br />graded and seeded periodically during the course of the project. The <br />Orono staff is to advise applicant or applicant’s agent when seeding <br />is to be conducted. <br />3. Park Construction shall be responsible for advising the City of <br />the monthly schedule of hauling activities so that staff can arrange <br />an inspection schedule for the month. Prior to hauli.tg any fill to <br />the site* Park Construction must arrange for a pre-construction <br />meeting with the Orono staff to review all final submittals and <br />tentative hauling schedule. The City will ask that a representative <br />of Its Police Department be present at the pre-construction meeting to <br />advise of any special traffic/safety concerns during the hauling <br />process. <br />4* Hauling activities shall not be conducted during the following <br />time periods: <br />6:30 a.m. to 8:30 a.m. <br />4v00 p.n. to 6:00 p.m. <br />Page 3 of 5 <br />v-.n, <br />K-H t*'*! <br />if VV. j• M. r:t'\ ‘Al <br />-3 ta <br />f. w. »/-? ? <br />Mm <br />M <br />’ r*- <br />X > V* ' <br />i. ‘ <br />' i : <br />-T/ <br />b <br />ft <br />./I <br />'5>* <br />' ' <br />.'^4-'Vi <br />. y t ^ * <br />e.*y. “r-vj Li1^^ <br />',rfi <br />"s: