My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-11-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
03-11-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2024 10:00:21 AM
Creation date
3/8/2024 1:03:06 PM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Christine Lusian
Created:
3/11/2024 1:45 PM
Modified:
3/11/2024 1:45 PM
Text:
https://legistarweb-production.s3.amazonaws.com/uploads/attachment/pdf/2453779/Orono_Fire_CD_DRAWINGS-Excerpts.pdf
ID:
2
Creator:
Christine Lusian
Created:
3/11/2024 1:45 PM
Modified:
3/11/2024 1:45 PM
Text:
https://legistarweb-production.s3.amazonaws.com/uploads/attachment/pdf/2453780/Bid_Tab.pdf
ID:
3
Creator:
Christine Lusian
Created:
3/11/2024 1:45 PM
Modified:
3/11/2024 1:45 PM
Text:
https://legistarweb-production.s3.amazonaws.com/uploads/attachment/pdf/2456999/Orono_Fire_LoR_Final.pdf
ID:
4
Creator:
Christine Lusian
Created:
3/11/2024 1:45 PM
Modified:
3/11/2024 1:45 PM
Text:
https://legistarweb-production.s3.amazonaws.com/uploads/attachment/pdf/2486958/Navarre_Water_Plant_Garage_Option.pdf
ID:
5
Creator:
Christine Lusian
Created:
3/11/2024 1:45 PM
Modified:
3/11/2024 1:45 PM
Text:
https://legistarweb-production.s3.amazonaws.com/uploads/attachment/pdf/2492032/Resolution_7458.pdf
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
authorize staff to use our existing contract with Oertel Architects to design an addition to the <br />storage garage at the Navarre Water plan for use as a temporary fire facility to service the Navarre <br />area. Justification: <br />a. The bids came in well over our projections. <br /> <br />b. We have yet to receive the judge's order related to Long Lake's lawsuit which leaves too much <br />ambiguity/liability for the city to commit to a contract for the project. <br /> <br />c. The alternate site, the water plant garage, provides a short term solution as a reduced cost. <br /> <br />d. Improvements at the water plant garage will benefit the city in the long term even after the fire <br />department can reclaim our fire facilities by providing much needed storage in the Navarre area <br />for public works and parks maintenance operations. <br /> <br />e. Delaying the project at the Navarre Fire Station site will allow the city to focus the <br />improvements on the long term facility needs of the city's emergency services with out the <br />additional cost of addressing out side entity interference. <br /> <br /> <br />COUNCIL ACTION REQUESTED <br />Motion to reject the bids received for the construction of a garage facility at 3770 Shoreline Drive and <br />authorize staff to use the existing contract with Oertel to design an addition for the existing Storage <br />garage at the Navarre Water Plant. <br />Motion to adopt Resolution 7458 at Exhibit E. <br />Exhibits <br />Exhibit A. Orono_Fire_DRAWINGS-Excerpts.pdf <br />Exhibit B. Bid Tab.pdf <br />Exhibit C. Orono Fire LoR_Final.pdf <br />Exhibit D. Navarre Water Plant Garage Option.pdf <br />Resolution 7458 <br />235
The URL can be used to link to this page
Your browser does not support the video tag.