Laserfiche WebLink
S»^- <br />Conduct a citizen survey to assess citizen attitudes <br />and desires concerning parks and leisure activities. <br />J. <br />tef'-. <br />Based on the results of this survey and with input <br />from the Parks Commission, the Planning Commission, <br />city residents and city staff, the Council <br />determines whether the current policies related to <br />parks and open space arc still valid or should be <br />changed. <br />■ <br />Based on the Parks and Open Space Policies defined <br />in #2 above, action plans are developed for <br />implementing parkland acquisition and development <br />plans . <br />r< <br />:■ <br />V-. <br />A. Develop a comprehensive bike/hike trail system <br />plan. <br />ii <br />j j-' <br />K--r, <br />-‘ti# ,.y' <br />pp:. ■ <br />The costs of <br />B. Identify areas where future development will <br />reach a level that would indicate the need for <br />additional park facilities. <br />1.) Determine the types of facilities to be <br />developed. <br />C. Determine if additional facilities are needed <br />in the City ’s existing neighborhood parks. <br />the Park Master Plan process are as follows: <br />m 1. <br />2. <br />Citizen survey $ 5,800 <br />Consultant assistance through the remainder of the <br />process 7,200 <br />•f-TOTAL $ 13,000 <br />W0M. ■ <br />,‘T: <br />nil' <br />v%; <br />lif <br />mms:.