Laserfiche WebLink
• <br />b. Oversizing of sewer connection between Daniels Long <br />Lake Heights and existing Long Lake Lift Station. <br />That oversizing was necessary to facilitate the exten- <br />sion of trunk sewer to an area which some day may be <br />serviced if the trunk line is extended beyond its <br />present point. Cost of $8,000. <br />C. That amount which the City of Orono has determined <br />cannot be assessed against certain properties <br />because those properties cannot be subdivided to a lot <br />size which necessitates public.sanitary sewer and <br />therefore said properties are not benefited by this <br />project and because the City will not allow <br />said properties to connect to the sanitary sewer <br />system, or the City will not construct the connection <br />lines necessary for a connection to be possible. <br />In the event that the City of Orono later allows <br />said properties to subdivide or to connect to the <br />sanitary sewer built in this project, the City of <br />Orono will reimburse itself for said amount through <br />connection charges or special assessment charges <br />against said properties pursuant to law. <br />The estimated maximum amount that assessing said <br />properties would have generated is $115,000. This <br />amount therefore is spread on the general tax levy. <br />• 2. Area Assessments <br />Certain properties within the benefited area of this project <br />have previously been assessed under earlier projects for the cost <br />of downstream trunk sewers into which the lateral sewers con- <br />structed under this project connect. These previously assessed <br />properties were assessed on the basis of area and are not being <br />further assessed for trunk on an area basis under this assessment. <br />Other properties within the benefited area, which were not pre- <br />viously assessed for trunk, are being assessed under this assessment <br />on the basis of $250.00 per acre. This charge represents the <br />adjusted cost taking into account inflation since the time of <br />the installation of the original trunk sewers that services all <br />benefited acre for the,cost of installation in this project of <br />the new trunk sewer necessary to serve this area. <br />-2- <br />of those <br />areas except <br />the Daniel's Long <br />Lake <br />Heights Area. <br />In <br />this case <br />the $250.00 <br />charge represents <br />the <br />amount assessed <br />per <br />benefited acre for the,cost of installation in this project of <br />the new trunk sewer necessary to serve this area. <br />-2- <br />