My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-26-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
02-26-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 10:38:49 AM
Creation date
2/23/2024 2:03:20 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />H:\ORNO\$2024 New Projects\Fee Estimate 2024 CIPP Construction Services.docx <br /> <br />February 15, 2024 <br /> <br />City of Orono <br />Attn: Adam Edwards <br />PO Box 66 <br />Orono, MN 55323 <br /> <br />RE: 2024 CIPP - Construction Phase Services <br /> <br />Dear Adam: <br /> <br />As requested, we have prepared a scope of services and estimated fee for the construction phase of the 2024 CIPP <br />Project. <br /> <br />Scope of Services <br /> <br />Construction Observation <br />Part-time construction observation will be provided. Duties of the Construction Observer will include the following: <br />• Attendance at the pre-construction meeting and all construction-related meetings <br />• Serve as a liaison between the city and the contractor <br />• Review of the completed work to determine if the project is in general conformance with the plans and <br />specifications <br />• Maintenance of construction documentation <br />• Communication with affected property owners, as necessary, to address their construction-related concerns and <br />issues <br /> <br />Construction Administration <br />Construction administration duties will include the following: <br />• Administering a pre-construction meeting <br />• Administering project meetings <br />• Preparation of pay estimates <br />• Contractor communications <br />• Liaison with City Staff and Council <br /> <br />Fee Estimate <br />Based on the scope of Construction Services described above, and the amount of unused time for the design phase of the <br />project we propose an additional $9,000 for the construction phase. Bringing the total not-to-exceed fee for design and <br />construction to $33,900 to be billed on an hourly basis. Please let me know if you have questions or need additional <br />information. <br /> <br />Sincerely, <br />Bolton & Menk, Inc. <br /> <br /> <br />David P. Martini, P.E. <br />Principal Engineer <br /> <br />69
The URL can be used to link to this page
Your browser does not support the video tag.