My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-22-1993 Council Packet
Orono
>
City Council
>
1993
>
03-22-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 3:59:35 PM
Creation date
2/16/2024 3:56:00 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3-ct <br />Jim Giathwol, Chairman <br />LMCD-Lake Access "^iskforce <br />216 Water Street <br />Excelsior, Minnesota <br />55331 <br />2-22-93 <br />Dear Jim, <br />As we have discussed previously, the City of Tonka Bay is receptive to "discussing" <br />the possible expansion of public access in the vicinity of the existing Tonka Bay City <br />docks. <br />The City understands the need for defining public access sites on Lake Minnetonka <br />and is willing to discuss their role in that process. <br />As an "offset” for expanding the public access In this area, however, the City would <br />expect some concessions from the DNR and other appropriate agencies. This list of <br />concessions includes, but may not be limited to the following: <br />1.Retention of all existing docks and slides as licensed by the LMCD. <br />2.The dredging of the channel leading from the main lake to the City dock area <br />and ramp. <br />3. <br />4. <br />The rip rap of the entrance to the channel from the main lake. <br />The construction of a retaining wall in the vicinity of the existing City docks. <br />5.The construction o^ a public fishing pier (this is also being pursued with Gene <br />Strommen as part of the Shoreline Fishing initiative). <br />6.Construction of additional lighting and fencing on arid In the vicinity of the City <br />docks to ensure protection of boats stored at that location. <br />7.Construction of paved walkways within the existing City park to provide access <br />to and"rorthe City docks, fishing pier (if constructed) and the publ.c access. <br />8.Construction of an expanded parking area for public use. This may be in the <br />area located between the City Hall and highway 19. <br />9.Complete paving of the existing City parking area immediately adjacent to the <br />ramp location and the existing City docks. <br />J
The URL can be used to link to this page
Your browser does not support the video tag.