Laserfiche WebLink
Item Uoil <br />c onirad <br />Ouanlity <br />UdU <br />Price <br />Quantity <br />To Dale <br />Ainoi at <br />To Date <br />^Snnge Order No. 1 <br />PiJ A • Unit Price <br />15 FouuJatioii piling unit price for <br />diffc'.cuce between apjuoved design and <br />actual total pile length in lieu of <br />S20/IJ« ADD lor add*l length and $3/U^ <br />DKDUCTT for reduced length <br />16 Foundation pihng unit price for <br />each pile over 80 feet in length <br />Total Change Order No. 1 <br />Lf-(10)S 10.00 (10)(100.00) <br />liA 1 S 100.00 1 . IDOJML. <br />$0.00 <br />Total Hid A <br />Uuit Price <br />Altcrratc No. 1 <br />Total Change Order No. 1 <br />Total Work Completed to Date <br />556.070.00 <br />0.00 <br />3.000.00 <br />____(LDa. <br />$559,070.00 <br />IJ934 nr?UP: