Laserfiche WebLink
Item Unit <br />CunUiid <br />Quantity <br />UdU <br />Price <br />Ouaoliiy <br />'lb D^lc <br />Ani<»unl <br />lb hjtc <br />Hill A ’ 400,000 nutCil Column or <br />1 lyilrnpillar Water 'l «nvcr 141.0 foct to <br />High Water Level <br />Furnish and install a cmiipictc elevated <br />water storage tank of the fluted column <br />or hydropillar design with 400.000 <br />gallon capacity within 39 feet of the <br />high water level including: <br />1 Foundation drawings <br />2 Tank drawings <br />3 Access road <br />4 Piling <br />5 Concrete foundation <br />6 Piping <br />7 Tank fabrication <br />8 l ank erection <br />9 Fleetncal <br />10 Painting <br />11 Cathodic protection sy'stem <br />12 Sitework <br />Total Hid A <br />Bid A • Unit Pnee <br />13 P'oundatiou pihng unit price for <br />difference between design and actual <br />total pile length - VOID; modified <br />by Change Order No. I <br />LS 1 5.400.00 100%5.400.00 <br />1^1 16.200.00 100%16.200.00 <br />LS 1 18.400.00 100%18.400.00 <br />LS 1 5 8 0.00 100%5 8 J5 0.00 <br />IS 1 31.600.00 100%31.600.00 <br />IS 1 4.800.00 100%4.800.00 <br />1 192.000.00 95%182.400.00 <br />I 113.900.00 95%10835.00 <br />LS I 73.500.00 80%58.800.00 <br />IS 1 70.900.00 95%67.355.00 <br />LS 1 4.800.00 95%.42! 60.00 <br />!S 1 2.300.00 <br />$592,150.00 $556,070.00 <br />Lr 20.00 ADD <br />LF 3.00 DLDUCT <br />$0.00 <br />Hid A • Alternate N<v I <br />14 Furnish Jt install a 6’ x 7’ double <br />door 10 lieu of specif. 3* x T <br />pedestrian door 3.000.00 100%3.000.00 <br />13954 RfP RPI