Application 2022 Fee Escrow Notes 2023 Notes
<br /> City Administrator may require an erosion control
<br /> escrow for projects disturbing soils. $1,000.00
<br /> Valuation based on ICC 2012 Building Valuation
<br /> tables
<br /> Total Valuation Fee Building Offical Recommending
<br /> $1.00 to$500 $26.25
<br /> keeping the table as it
<br /> $501.00 to$2,000.00 $26.25 for the first$500.00 plus$3.41 for each additional$100.00,or
<br /> fraction thereof,to and including$2,000.00
<br /> $2,001.00 to$25,000.00 $77.40 for the first$2,000.00 plus$15.49 for each additional$1,000.00,
<br /> or fraction thereof,to and including$25,000.00
<br /> $25,001.00 to$50,000.00 $433.67 for the first$25,000.00 plus$11.29 for each additional
<br /> $1,000.00,or fraction thereof,to and including$50,000.00
<br /> $50,001.00 to$100,000.00 $715.92 for the first$50,000.00 plus$7.88 for each additional$1,000.00,
<br /> or fraction thereof,to and including$100,000.00
<br /> $100,001.00 to$500,000.00 $1109.92 for the first$100,000.00 plus$6.30 for each additional
<br /> $1,000.00,or fraction thereof,to and including$500,000.00
<br /> $500,001.00 to$1,000,000.00 $3,629.92 for the first$500,000.00 plus$5.25 for each additional
<br /> $1,000.00,or fraction thereof,to and including$1,000,000.00
<br /> $1,000,001.00 and up $6,254.92 for the first$1,000,000.00 plus$4.20 for each additional
<br /> $1,000.00,or fraction thereof
<br /> State Surcharge as required by State
<br /> Demolition
<br /> Demolition:Principal structure $100.00 $000.00
<br /> Demolition:Accessory structure/Septic system
<br /> (Per unit fee) $50.00 $1,000.00
<br /> Based on Value May require City Council
<br /> Retaining walls Table $1,000.00 approval(Variance or CUP)
<br /> City Administrator Engineer may require an
<br /> erosion control escrow for projects disturbing Not to Exceed
<br /> soils. 1000
<br />
|