My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #281-3rd Ser/ 2023 Fee Schedule
Orono
>
Ordinances
>
Ord #281-3rd Ser/ 2023 Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 10:30:53 AM
Creation date
2/16/2024 10:25:38 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Application 2022 Fee Escrow Notes 2023 Notes <br /> Vehicle Storage $50.00 78-1577(C) $55.00 10%Increase <br /> Land Alteration $50.00 $1,000.00 May also require a IUP $100.00 Requires Planning and Engineering time. <br /> Tent/Canopy Permits $50.00 $55.00 10%Increase <br /> *City Administrator may require an erosion $1,000.00 Variable depending on <br /> control escrow for projects disturbing soils or tree project scope,but not to <br /> replacement. exceed <br /> Zoning confirmation letter $50.00 confirmation letter $55.00 10%Increase <br /> Address Change Request by Owner $50.00 $55.00 10%Increase <br /> BUILDING CODE ADMINISTRATION: <br /> Based on Value <br /> Building Permits Table <br /> Building permit fees(Building,Plumbing, Based on 2012 <br /> Mechanical,unless otherwise noted) Building Valuation <br /> Table <br /> 65%of Building <br /> Plan Review Fee Permit Fee <br /> iti e a red .. ha $75.00/hour <br /> additions,or revisions to approved plans adding <br /> minimum one half hour charge(does not apply a Plan Up to the cost of the Plan Review Fee <br /> to commercial plumbing) Review Based on Building Offical <br /> Rereview Plan Fee Fee Recommendation <br /> Minimum Fee $26.25 <br /> Moved-In Structure (not including foundation, <br /> interior remodel,etc.) $275.00 <br /> Pre-Move Inspection $165.00 <br /> Special investigation fee(work started without 100%of Building <br /> obtaining a permit—applies even if no permit is permit fee <br /> pulled) <br /> Manufactured Home Installation$275.00 plus <br /> State Surcharge and requires a regular building <br /> permit if also doing basement,foundation,garage <br /> or entryway,fees are based on sq.ft.State Table $275.00 <br /> Refunds:80%of building permit fees on projects not yet started <br /> (within 90 days of permit issuance by municipality). No refund on <br /> plan review fees,state surcharge or maintenance permits <br />
The URL can be used to link to this page
Your browser does not support the video tag.