My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #243 - 3rd Ser/Amending grading regs
Orono
>
Ordinances
>
Ord #243 - 3rd Ser/Amending grading regs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 10:16:05 AM
Creation date
2/16/2024 10:25:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Secs. 78-15954-78-1600. - Reserved. <br /> SECTION 4. Article XIV of Chapter 78 shall be amended by adding and deleting text to read <br /> as follows: <br /> ARTICLE XIV.-INTERIM USES <br /> DIVISION 1. -GENERALLY <br /> Sec. 78-1726. -Interim use permit required. <br /> An application for an interim use permit shall be accompanied by a certified site plan showing the <br /> location of the proposed excavation or storage and shall state the amount of material which is to be <br /> removed, excavated or stored, placed, or graded, and such other information as the council may require. <br /> Applications shall be filed with the city administrator and shall be accompanied by a deposit to be <br /> determined by the city, which will be used to offset the cost of processing the application. Any unused <br /> portion will be refunded to the applicant. <br /> (a) Except where otherwise provided in the article, it is unlawful for any person to perform or have <br /> performed the following land alteration activities without an interim use permit issued by the <br /> council: <br /> (1) Mining.The commercial extraction of sand,gravel or other material from the land and their <br /> removal from the site without processing shall be mining. In all districts, the conduct of <br /> mining shall be permitted only upon issuance of a interim use permit. Such permit shall <br /> include, as a condition, a plan for a finished grade which will not adversely affect the <br /> surrounding land or development of the site on which the mining is being conducted,and the <br /> route of trucks moving to and from the sites.A bond will be required for restoration <br /> (2) Soil processing. The operation of processing of sand, gravel or other material mined from <br /> the land shall be permitted only by interim use permit. Such permit shall include a site plan <br /> where the processing is to be done,showing the location of the plant,disposal of water,route <br /> of trucks moving to and from the site in removing processed material from the site, the <br /> condition in which the site is intended to be left upon completion, hour of operation; and <br /> such permit shall not be granted for a period of longer than 12 months <br /> (3) Creation of an engineered grade for the basis of building height determination outside of a <br /> subdivision. <br /> (4) Unless included as part of a permitted project or as exempted below,the following activities <br /> require a separate Interim Use Permit. <br /> Page 112 Final Draft <br />
The URL can be used to link to this page
Your browser does not support the video tag.