Laserfiche WebLink
DIVISION 1. - GENERALLY <br /> Subdivision I. —Land Alterations <br /> Section 78-1725 Purpose and Intent <br /> The purpose of this section is to promote the health, safetv, and welfare of the communitv and <br /> to establish reasonable uniform limitations, standards, and controls for land alterations, <br /> excavatinq, fillinq and qrading within the city. The requlations will allow the city to better <br /> manaqe stormwater discharqe, ensurinq drainaqe does not neqativelv impact neighborinq <br /> properties, manaqe haulina traffic and noise, and prevent erosion issues onto adjacent <br /> properties, wetlands, lakes, and roads. <br /> Sec 78-1726 Interim Use Permit Reauired <br /> An application for an interim use permit shall be accompanied bv a certified site plan showinq <br /> the location of the proposed excavation or storage and shall state the amount of material which <br /> is to be removed, excavated or stored, placed, or qraded, and such other information as the <br /> council may reauire. Applications shall be filed with the city administrator and shall be <br /> accompanied by a deposit to be determined bv the city, which will be used to offset the cost of <br /> processinq the application. Any unused portion will be refunded to the applicant. <br /> (a) Except where otherwise provided in the article, it is unlawful for any person to qerform or have <br /> performed the followinq land alteration activities without an interim use qermit issued bv the <br /> council: <br /> (1) Mining. The commercial extraction of sand. gravel or other material from the land and <br /> their removal from the site without processina shall be mining. In all districts, the conduct <br /> of minina shall be permitted onlv upon issuance of a interim use permit. Such permit <br /> shall include, as a condition, a qlan for a finished grade which will not adversely affect <br /> the surroundinq land or development of the site on which the mininq is beinq conducted, <br /> and the route of trucks movinq to and from the sites. A bond will be reauired for <br /> restoration <br /> (2) Soil Processinq. The operation of processinq of sand, qravel or other material mined <br /> from the land shall be permitted onlv by interim use permit. Such permit shall include a <br /> site plan where the processinq is to be done, showina the location of the plant, disposal <br /> of water, route of trucks movina to and from the site in removina processed material from <br /> the site, the condition in which the site is intended to be left upon completion, hour of <br /> operation; and such permit shall not be aranted for a period of lonQer than 12 months <br /> (3) Creation of an enaineered arade for the basis of buildinq heiqht determination outside of <br /> a subdivision. <br /> (4) Change the arade or shore of lakeshore propertv within the shore setback, in excess of <br /> 50 cubic vards. <br /> (5) StockpilinQ on site in excess of 500 cubic vards, without an associated buildina permit. <br /> (6) Anv import/export of material in excess of 500 cumulative cubic vards, also see Citv <br /> Code 78-1286 (d)(3). <br /> �7) Conducting Qradinq or land alterations which result in chanqes in elevations within <br /> five feet of adiacent properties outside of an active buildina permit. <br />