Laserfiche WebLink
Zoning File ^1802 <br />Februar>’ 12, 1993 <br />Page 5 <br />Paving improven'ent'j to be approved based on final grading and drainage <br />plan. Such plan to show grades and typical section. Striping of all <br />designated parking stalls. <br />B.landscaping per plan submitted by EOS Architecture for Orono Student <br />Center, Sheet #P-2. <br />All traffic flow, stop and fire lane signage locations will be determined by the <br />Orono staff. <br />3.Sign at approximately 19 s.f. shall be installed per plans by EOS Architecture for <br />the Orono Student Center, Sheet /S'P-3, to be installed at a maximum height of 4 ’ <br />2". <br />4.The new addition shall be installed with an approved sprinkler system and a fire <br />alarm system that should be tied to the sprinkler system. <br />5.Upon application for building permit, the applicant will be responsible for <br />necessary SAC payment and for any additional sewer or water charges toi uie <br />intensification of use. <br />6. What is your recommendation for final number of parking stalls? <br />A. 40 as proposed by applicant. <br />B- 57 approved in 1982 for full church use. <br />C. Other. <br />Tlie School District shall be asked for a permanent 10’ easement to allow the installation <br />of an 8’ wide bike trail to be installed within the street yard. The City shall make all necessary <br />landscaping replacement. <br />-