My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-08-1993 Council Packet
Orono
>
City Council
>
1993
>
03-08-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 10:01:38 AM
Creation date
2/16/2024 9:57:17 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
To:Orono Planning Commission Members <br />Ron Moorse, City Administrator <br />From: <br />Date: <br />Subject: <br />Jeanne A. Mabusth, Building & Zoning Administrator <br />Februar>' 12, 1993 <br />#1802 Orono School District #278, 770 Old Crystal Bay Road <br />Conditional Use Permit - Public Hearing <br />Zoning District: RR-IB <br />Required area = 2 acres <br />Existing = 195,000 s.f. or 4.42 acres <br />Pertinent Ordinances <br />1. Section 10.28, Subd. 3 (A) - Conditional use permit required for a 36’ x 50’ addition to <br />existing structure currently approved for day care/church use. The addition shall allow <br />for expanded day care use and extra curricular student uses (review E.xhibit B). <br />2. Section 10.09, Subd. 3 - Conditional uses/site plan review. <br />List of Exhibits <br />A -Application <br />B -Applicant ’s Addendum <br />C -Property Owners List <br />D-Plat Map <br />E -Survey <br />F -Proposed/Existing Site Plat <br />G -Floor Plan <br />II -Elevations/Sign <br />I -Specs for Outdoor Lighting <br />J -Gustafson Rtport 2/4/93 <br />K -Bike Trail Sketch <br />L -Building Official’s Preliminary Plan Review <br />History of Property and Current Use <br />In 1982 a conditional use permit was approved for the Orono Community Church. The <br />existing church housed all church use up to about 1987 when Busy Beaver Day Care applied <br />for a conditional use permit to allow a day care. Day care use was lunited to a maximum 29 <br />student/teacher ratio as building was not sprinkled. In the summer of 1991. a sprinkler system <br />was installed in the building. The day care now op>erated by the Oron»i School District was <br />allowed to expand beyond the 29 u.se level. The property was purchased by the Orono School <br />District sometime in 1992. The church with a limited congregation continues to lease the <br />structure for church uses on Wednesday and Sunday. The pastor of the church continues to use <br />one of the offices throughout the week.
The URL can be used to link to this page
Your browser does not support the video tag.