Laserfiche WebLink
Agreement No. PW 55-08-23 <br />CSAH No. 112; C.P. 2091103 <br />8 ___ <br />6.2.1 Electrical Service Costs. Orono, at its sole costs and expenses, shall provide <br />electrical energy for the operation of the Signal Systems and shall maintain fuses <br />and wires to the load side of the meter socket of the traffic Signal Systems and <br />integral street lights/luminaires. <br />6.2.2 Traffic Signal System Adjustment. Orono shall not revise by addition or <br />deletion, nor alter or adjust any component, part, sequence, or timing of the <br />Signal Systems, however, nothing herein shall prohibit prompt, prudent action <br />by properly constituted authorities in situations where a part of such Signal <br />Systems may be directly involved in an emergency. <br />6.2.3 Signal Luminaires. Orono shall provide all required maintenance for the lamps <br />on the luminaire extensions above the signals. Maintenance includes but is not <br />limited to replacing burned out luminaire lamps, replacing fixtures, replacing <br />other lighting components, and replacing fuse and wire from luminaire lamp to <br />load side of meter socket of the Signal Systems. <br />6.2.4 Signal Painting. Not applicable to the Project. <br />6.2.5 Signal Cleaning. Orono shall be responsible for general cleaning and graffiti <br />removal from the Signal System equipment and components. <br />6.2.6 Blocking County Roadways. When performing the Signal System <br />maintenance work under this Agreement, Orono may partially block affected <br />County roadways within its corporate limits if needed. In cases of emergency, <br />such County roadways may be wholly blocked and the passage of traffic thereon <br />prevented by Orono. At no time, however, shall Orono continue to obstruct the <br />free passage of traffic on the County roadways for a longer period of time than <br />is reasonably required for making the necessary traffic signal repairs. Orono <br />shall not cause any portions of the County roadways on which traffic control <br />signals are to be maintained to be closed to traffic for any reason other than those <br />above without receiving prior written approval from Hennepin County and in no <br />event for a time longer than shall be necessary. In the event of the total blocking <br />or closing of any such County roadways, Orono shall provide a suitable detour <br />during such time. <br />6.2.7 Materials. When performing the Signal System maintenance work under this <br />Agreement, Orono shall be responsible for proper signing, marking, barricading <br />and such other warning devices as may be required to adequately protect the <br />pedestrian and vehicular traffic. All materials used by Orono in the performance <br />of the maintenance work shall conform to the requirements of the current Edition <br />of the MnDOT "Standard Specifications for Highway Construction" and all <br />amendments and supplements thereto. All traffic signs, pavement markings and <br />warning devices shall comply with the current Minnesota Manual on Uniform <br />Traffic Control Devices (MN MUTCD). <br />Street Lighting. Orono shall own and maintain the streetlights including the light poles <br />installed as part of the Project according to Orono practices at no cost to the County. <br />271