My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-11-1993 Council Packet
Orono
>
City Council
>
1993
>
01-11-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2024 3:48:42 PM
Creation date
2/5/2024 3:45:35 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />rf <br />TO: <br />PROM: <br />DATE: <br />SUBJECTI <br />1^ <br />4 ✓ <br />4 <br />Ron Moorse, City Administrator <br />John R. Gerhardson, Public Works Director <br />January G, 1933 <br />Demolition Costs Old Facilities - Crystal Bay <br />" /r ^O/,.' Pp <br />iir <br />As requested, I have rece /ed estimates for the demolition of the <br />existing City buildings at Crystal Bay. The costs listed below do <br />not take into consideration burn'-'g any of the buildings. <br />I have been advised that the lumber yard building will not be that <br />easy to burn because there are no interior walls. The <br />administration office is constructed of cement block and we may not <br />benefit much by burning. The council chamber building is <br />constructed of stucco and clay tile and will not burn. In <br />addition, there has been some interest in relocating the building. <br />The public works office and two garages can be burned but not until <br />the new fueling system is up and running as both buildings supply <br />electricity to the gas and diesel fuel pumps. <br />I am recommending to demolish the lumber yard building now because <br />of the unsafe condition and there is concern about children getting <br />inside and getting hurt. <br />The costs for the lumber yard are estimated at $11,640. The debris <br />from the wood portion of the building can be added to our brush <br />chipping pile and given to citizens. <br />Equipment with operator <br />Container and landfill costs (I7x$225) <br />$ 3,600 <br />3,825 <br />Public Works Office and Oarage <br />Equipment with operator <br />Container and landfill costs (10x5225) <br />2,400 <br />2,250 <br />Lumber Yard Building <br />Equipment with operator <br />(tear do%m and dig out footings) <br />Equipment with operator (chipping) <br />Container and landfill (concrete footings) <br />4.800 <br />5,040 <br />1.800 <br />Council Chambers <br />Equipment and operator <br />Container and landfill costs <br />2,400 <br />i>52& <br />$31,780
The URL can be used to link to this page
Your browser does not support the video tag.