My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-1993 Council Packet
Orono
>
City Council
>
1993
>
11-22-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2024 3:59:41 PM
Creation date
1/23/2024 3:57:09 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
*• m 4 • ^ .M* • • <.• •.-» « ■ «r'<7. * .t. ..^ <br />CITY of ORONO <br />Municipal OfTices <br />Street Address: <br />2750 Kelley Parkway <br />Orono. MN 55356 <br />Mailing Address: <br />P.O. Bo* 66 <br />Crystal Bay. MN 55323 0066 <br />November 19, 1993 <br />Chuck Sigemid <br />District Engineer MnDOT <br />1500 West County Road B2 <br />Roseville. Minnesota 55113 <br />Dear Mr. Sigerrud, <br />This letter is to re-state the importance of the planned safety improvement project for <br />Highway 12 in Long Lake and Orono. This project was originally scheduled for construction <br />in 1993. It has now been delayed until the Spring of 1995. After a large increase in accidents <br />at the intersection of Willow and Highway 12 in 1992, the cities of Orono and Long Lake <br />formed a committee to determine whether there were any interim solutions to the safety <br />problems at the intersection. The cities proposed the installation of temporaiy signalization at <br />the intersection. However, the alternative was not acceptable to MnDOT because of the need <br />for rechannelization of the intersection, the cost of the temporaiy signalization. and because the <br />permanent safety improvements were scheduled in the near term. The Committee has not lound <br />anv other feasible interim solutions to the .safety concerns at the intersection of Willow and <br />Highway 12. <br />It is critical that the Highway 12 safety improvements project proceeds on schedule for <br />completion in 1995. Please let me know- if there is anything the cities of Long Lake and Orono <br />can do to ensure this project remains on schedule. <br />Citv Administrator <br />relrphniu- :i'2( 47.V7357 • FAX 47.A-031ft
The URL can be used to link to this page
Your browser does not support the video tag.