My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-17-1986 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1980-1989
>
1986 Planning Packets
>
11-17-1986 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 10:06:35 AM
Creation date
1/18/2024 10:00:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 to <br />Lng <br />ack <br />mg <br />ns: <br />ity <br />M- <br />Zoning File #1090 <br />November 11, 1986 <br />Page 5 <br />2» Driveway access from County Road 6 must be permanently closed and <br />regraded to eliminate future use of that access, to be completed <br />within 6 months of City Council's final plat approval. <br />3. Detached garage on Lot 2 must be removed from front y^vrd setback <br />area within 6 months of City Council's final plat approval. <br />4. Given questionable stability of the barns on Lot 2, and given <br />their non-conformity as to size and location in relation to their use <br />for housing animals, barns on Lot 2 must be removed within 6 months of <br />City Council's final plat approval. <br />(Items 1 through 4 to be subject to a Developer's Agreement with <br />appropriate security posted to ensure compliance. No building permits <br />shall be issued for new construction until such work is completed.) <br />5. Soil testing for alternate drainfield sites for both Lots 1 and 2 <br />must be submitted by applicant and approved by staff prior to Council <br />review of preliminary plat application. <br />6. Drainage easement for wetland on Lot 1 must be shown on final <br />plat. <br />7. In granting this subdivision, the following variances are <br />appropriately granted: <br />a) Variance to required width of lot frontage on public road for <br />Lot 1 (186.90* proposed, 200' required). <br />b) Variance to front yard setback requirement for house on Lot 2 <br />(49.29* existing, 50' required). <br />8. Subject to standard 10' Drainage St Utility Easements along <br />perimeter lot lines, 5' either side of interior lot lines. <br />Additional potential conditions for discussion: <br />9. On Lot 1, for purposes of establishing the allowable locations of <br />accessory structures: <br />a) The lot line along Hollander Road is the front lot line; <br />b) The side of the house facing Hollander Road is considered as <br />establishing the front line of the house; <br />c) The lot line along County Road 6 is the rear lot line;
The URL can be used to link to this page
Your browser does not support the video tag.