Laserfiche WebLink
To Mary Butler, Mayor <br />Mark E. Bernhardson, City Administrator <br />Orono Council Members <br />Orono Planning Commission Members <br />From: <br />Date: <br />Jeanne A. Mabusth, Zoning Administrator <br />November 11, 1986 <br />Subject:#1083 Thomas J. Bernier, Doug Klint and Gary Barr <br />3535 & 3545 Ivy Place and 3034 Casco Point Road — <br />Renewal Subdivision Application For a Lot Line <br />Rearrangement - Class II <br />List of Exhibits <br />Exhibit A - Building Permit/Sketch Plan <br />Exhibit B - Location of Utilities Within Access Stair Corridor <br />Status of the violations on the subject properties: <br />1. Both B^rr and Bernier agree that docks will not be re-installed until <br />the proposed plat is finalized. Please note Barr was issued a building <br />Permit (Exhibit A), for a new dock in June of 1985. The illegality of dock <br />was not known by the staff member issuing the permit. The attached sketch <br />was represented to staff as one building site. <br />2. Bernier has opted not to go with a formal conditional use <br />permit/variance to allow the existing stairs to remain but has filed for an <br />after-the-fact building permit (double fee) to reconstruct stairs per <br />approved standards of City for all lake access stairs - 4* maximum stair <br />width - installed on grade when feasible with wood pulp (treads) on <br />existing grade. Review Exhibit B, the original stairs were constructed <br />over existing sewer and water lines involving the removal of approximately <br />2 to 3 feet of fill. This constiuction poses potential freezing cf the <br />lines without the required level of fill to protect from cold temperatures. <br />Bernier has agreed to fill the disturbed area back to the height of the <br />original grade prior to your meeting. The stairs cannot be altered until <br />the spring because of the fast approaching winter season and the inability <br />to schedule a contractor within the limited time. The City will ask that <br />Bernier enter into a Developer's Agreement and post appropriate security to <br />assure the stairs are altered per approved City standards by April 30, <br />1987. <br />Klint has installed the screening barrier along the shoreline to <br />prevent futher erosion into lake. The ground area and mutilated tree <br />remains have not been corrected - once again inability to schedule a <br />contractor - majority of landscaping constractors have already been <br />committed at this time of year. The City will ask that Klint execute a <br />Developer's Agreement and post appropriate security to assure that final <br />grading, restoration of ground cover and tree trimming is completed by <br />April 30, 1987. Klint will cover the entire area v/ith hay bales to prevent <br />erosion - in early spring. Staff will provide photographs of both sites at <br />your meeting. <br />I <br />k