My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-17-1986 Planning Packet
Orono
>
Planning Commission
>
1986
>
11-17-1986 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 10:06:35 AM
Creation date
1/18/2024 10:00:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ihe foundotion The Erection <br />The foundation is the responsibility of your <br />church. Hire a local contractor. Or do the work <br />using people from the congregation. Again, the <br />job is reasonably simple. Size and concrete <br />requirements are shown below. <br />J.M. Stewart will erect the Herald XL and <br />Supra at your church — on your foundation. Or <br />Size <br />Concrete Req. <br />2 Each <br />3'3"x3 ’ X <br />4' Deep <br />3 Cu. Yds. <br />Supra <br />2 Each <br />2'3"x3' X <br />4' Deep <br />2 Cu. Yds. <br />Standard <br />2 Each <br />2'x 2'3"x <br />3' Deep <br />1 Cu. Yds. <br />— we will allow a cash credit (See Price Sheet) <br />if people from your congregation choose to do <br />the work themselves. The job is reasonably <br />simple, so if you have access to a small crane, <br />consider this money-saving option. <br />The Herald Standard requires only common <br />tools and can be easily erected by laymen of <br />the church. <br />In addition, J.M. Stewart furnishes detailed <br />engineered foundation drawings. And we provide <br />the anchor bolts with nuts and washers to complete <br />the job. (See illustration under “Supporting <br />Structure.) We also provide templates for setting <br />the anchor bolts to match the base plate. <br />•elfvery <br />Allow 8-10 weeks for delivery after the order <br />and approved art work has been received by J.M. <br />Stewart. Signs are shipped via common carrier <br />(motor freight). We prepay shipping charges to <br />avoid any inconvenience at your end of the delivery. <br />These charges are not included in the price <br />of the sign. You will be invoiced for delivery. <br />For additional Information or to order call or write: <br />J.M. STEWART (oor^boratio/v <br />1561 MACKERRL. SARASOTA. FLORIDA 33577 <br />5454 EAST SUSSEX. FRESNO. CALIFORNIA 93727 <br />NATIONAL TOLL FREE 1-800-237-3928 <br />FLORIDA 813-365-9304 COLLECT <br />OTHER PRODUCTS OFFERED • <br />CHANGEABLE LETTER BOARDS CAST PLAQUES WOOD SIGNS ARCHITECTURAL LETTERS <br />CORK & CHALK BOARDS (Bronze & Aluminum)SAND BLASTED CAST BRONZE <br />DR Y ERASE MARKER BOARDS MEMORIAL ROUTED CAST ALUMINUM <br />PRESENT A TION BOARDS <br />CORK BULLETIN BOARDS <br />BUILDING DIRECTORIES <br />DEDICATORY <br />NAMEPLATES <br />ROOM IDENTIFIERS <br />HAND CARVED PLASTIC <br />COPYRIGHT 1984 BY THE J.M. STEvVART CORPORATION <br />SARASOTA. FLORIDA. ALL RIGHTS RESERVED.
The URL can be used to link to this page
Your browser does not support the video tag.