Laserfiche WebLink
li' V <br />1 <br />» <br />pt -:r,, % <br />f .. ■ jt" - <br />Af- -. -,''•> ■ *v. <br />Jiff <br />. 1^'^'■ >: <br />■t. <br />p'‘ <br />1 <br />?5:> <br />...j. <br />■^i <br />I <br />Date <br />Zoning File #1093 <br />Michael P. Gaffron, <br />Asst Planning & Zoning Administrator <br />November 13, 1986 <br />Subject: Septic Systems Review <br />Proposed Lot 1 <br />A. Existing System (existing house) was last inspected in August <br />1986; system appeared to be substandard in size but functional; <br />the house may not have been occupied at the time. <br />B. Alternate Site tested in area south of house - average <br />perculation 107 MPI, average slope 6-8%, mottling at 18", 27", <br />30" - site would be suitable for a mound system. <br />Proposed Lot 2 <br />A. Primary Site tested on southwest-facing slope - average <br />perculation 47.4 MPI, average slope 9-18%, mottling 36", 44", 40" <br />- site is marginally suitable for a mound, is adjacent to <br />drainage swale - needs additional review. <br />B. Alternate Site tested on south-facing slope - average <br />perculation 49.3 MPI, average slope 12-20%, mottling at 48", 40", <br />30" - site is very questionable for a mound given the slopes and <br />proximity to drainageway. <br />Proposed Lot 3 <br />A. Primary Site tested on southwest-facing slope - average <br />perculation 38.9 MPI, average slope 10-12%, mottling at 48", 48" <br />- site is suitable for a shallow trench system, needs curtain <br />drain. <br />B. Alternate Site tested just downhill from primary - average <br />perculation 49 MPI, average slope 3-4%, mottling at 30", 29" - <br />this site is suitable for a mound system. <br />Proposed Lot 4 <br />A. Primary Site tested cn northeast facing slope near "saddle" <br />of lot - unclear between topography and site evaluators notes as <br />to exact location - average perculation 38.3 MPI, average slope <br />15-20% apparently, mottling at 48", 47" - site is suitable for <br />shallow trench system if curtain is installed and if site is <br />actually on the slope and not in the saddle area. <br />B. Alternate Site tested northwest of primary site - average <br />perculation 46.9 MPI, average slope 7-10%, mottling at 41", 42" - <br />site is suitable for a mound system.