My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-19-1986 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1980-1989
>
1986 Planning Packets
>
05-19-1986 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 11:15:45 AM
Creation date
1/17/2024 11:09:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOERENBERG MEMORIAL COUNTY PARK <br />Revised Cost Estimate - 5 August 1985 <br />1.This consists of an updated cost estimate for the basic support services <br />as discussed In the Draft Report of March 14, 1985. <br />50 Car Parking Lot $ 43,662 <br />1800 Square Feet Visitor Center <br />Water Distribution System <br />Memorial Arbor - 832 Square Feet <br />Utilities <br />Plantings (east side of property) <br />180,000 <br />100,000 <br />23,870 <br />30,• •• <br />TOTAL <br />25,000 <br />j[402,^32 <br />2.Features which should be developed to provide a minimal, but useable <br />display garden. <br />Grading and Demolition $ 14,923 <br />Terrace, Walls and Steps at Visitor Center <br />Brick Pathways <br />Walls and Steps <br />Trellis In Garden <br />TOTAL <br />11,649 <br />95,069 <br />19,656 <br />3,300 <br />Plantings for Remainder of Property <br />(Including floral display areas) <br />TOTAL OF DEVELOPMENT IN NO. 1 AND NO. 2 <br />1144,597 <br />$123,887 <br />S671,016 <br />3.Additional features which would complete the development as Indicated on <br />the plans. <br />Arbor at Visitor Center $ 13,200 <br />Walled Garden <br />Curb Edging In Garden <br />Limestone Pathway with Steps <br />Water Feature <br />Exterior Fence and Gate <br />Screen Gazebo <br />Lake Edge Rip-Rap <br />III <br />III <br />SUB-TOTAL <br />TOTAL TO CCMPLETE DEVELOPMENT AS SHOWN ON PLANS <br />^4,100 <br />$885,116 <br />NOTE:These estimated costs represent construction costs In 1985 dollars <br />only; and do not Include fees, charges and contingency.
The URL can be used to link to this page
Your browser does not support the video tag.