Laserfiche WebLink
3. <br />b. <br />c. <br />The existinc location of the driveway and toe of slope should be <br />,n LaLd duritm the final grading. Slope should be covered with topsoil <br />seeded with mixture of 500 seed and covered with mulch material prior <br />to September 20, 1993. <br />Driveway shall be constructed with the 3% cross slope toward the berm <br />from west to east and aloni: the north side ol the berm a lour inch sh« <br />formed integral bituminous curb shall be constructed to control the <br />drainage. <br />d A silt fence or other appropriate erosion control must be installed at the <br />low area to the east during the linal grading stages. <br />upon approval of this subdivision by the City Council of Orono the subdivider <br />shall apply for the following legal combmations for lax purposes. <br />Parcel A as described on the survey noted above shall be combined with <br />Outlot A. fairway Hills Addition. <br />Parcel I) as described on the survey noted above shall be legally combined <br />with Lot 2. Block 1, Fairway Hills Addition. <br />Tlie afoiesaid division a shown on the <br />nied by the City of Orono wuh either 'h' ^ ^ ^ ^ <br />Registrar of Titles Office on or belore March 13. U94 togemer <br />tiriginal copy of this rcsidution. <br />TliesulH.iv .er IS hereby advi.d .l..ino^d^^^ <br />additional documentation must be created by subd P <br />title of these newly created parcels. <br />a. <br />b. <br />Page 2 of 3