My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-1993 Council Packet
Orono
>
City Council
>
1993
>
09-13-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2024 2:00:56 PM
Creation date
1/12/2024 1:57:43 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o o \ \ <br />/•' <br />: I ’ <br />I •. \\ > ^- A ,V- <br />• * <br />'i’V <br />■•J^esHot <br />• t, *'"r <br />fr <br />*v <br />CITY of ORONO <br />Municipal Oftic« <br />P(Kl cxnct Box 66 <br />CnsUl Ba\. Minnevtu 55323-^Ji^Ni <br />June 10, 1993 <br />Chuck Siggerud <br />Metro Distr'-ct Engineer <br />MnDOT <br />1500 West County Road 5-2 <br />Roseville, Minnesota 55113-3105 <br />Dear Mr. Siggerud, <br />Upon meeting you at the Highway 12 Alliance meeting in <br />Willmar, I was impressed with your willingness to be of assistance <br />to cities regarding problems or concerns related to Highway 1^. I <br />am sure I will be calling on you for assistance related to the <br />«iqhway 12 Corridor Study. In the meantime, there is another issue <br />related to Highway 12 that has been of continuing concern to the <br />City of Orono. The concern is with the delays in moving ahead <br />the Hichway 12 safety improvement project planned for Orono and <br />Long Lake, and the lack of cooperation from MnDOT in providing an <br />interim solution to the dangerous traffic conditions on Hignway 12, <br />esoeciallv at the Willow Drive intersection. The safety <br />improvement project was to be constructed in 1993. In 1992 the <br />City was advised the project would be delayed until 1994 in ^993 <br />the City was advised the project will be delayed until 1--^- <br />City has not been provided with an expiration for the delays or <br />iny assurances that the 1995 date is a firm date. <br />To help the City to understand your process of scheduling and <br />pri■^ritizing these projects, please provide the City with a listing <br />of tr- projects with which the Highway 12 safety improvements <br />project is competing, a list of the criteria used for prioritizing <br />or ranking the projects, and an explanation o,. why the Highway ^ <br />project 18 ranked lower than those projects tnat are schedulea for <br />ronst-uction in '93 and '94. Please also provide a listing o. the <br />projects that will receive funding in 1993 and 1994. <br />-^he Cities of Long Lake and Orono have agreed to participate <br />in the cost of installing a temporary traffic signal at the Wixxow <br />orive intersection. MnDOT has indicated the signalizaticn ^n not <br />proceed without roadway widening and channelization. MnDOT has <br />*1*0 'id'cated it is not willing to use cooperative agreement funds <br />teT^'lrily widen and channelize the inceraecticn bec.uae it i. <br />not co»t effective to do thia tenporary work and then replace i. <br />T¥1 rPHONH 4-^.VW • »4.\ 4rV»SI0
The URL can be used to link to this page
Your browser does not support the video tag.