My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-09-1993 Council Packet
Orono
>
City Council
>
1993
>
08-09-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 9:59:42 AM
Creation date
1/9/2024 9:56:29 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HENNEPIN <br />DEPARTMENT OF PUBLIC WORKS <br />320 Washington Avenue Soi^^- <br />Hopkins, Minnesota 55343*a3(i8 <br />PHONE: (612)930-2500 <br />FAX (612)930-2513 <br />TDD: (612) 930-2696 <br />June 23, 1993 A r c <br />Mr. John Gerhardson <br />Director of Public Works <br />City of Orono <br />2750 Kelley Parkway, P.O. Box 66 <br />Crystal Bay, MN 55323 <br />RE: ISTEA Application for STP Funds For CSAH 6/8941 <br />Dear Mr. Gerhardson: <br />We would very much appreciate your support for our application for the above <br />project so that we may have the opportunity to obtain 80% federal funding for the <br />project. Enclosed is a generic letter for your possible use in support of the <br />application we are making for STP funds. <br />In determining the ranking of the project, two of the Items we need to address <br />are: first, consistency with the City’s Comprehensive Plan, and secondly letters <br />Indicting at least general support for the project. The specific criteria in the <br />application to which we are responding are: <br />Consistency With local Plans <br />“Consistency with the local or county comprehensive plan. Implements a <br />solution or addresses a problem Identified in the plan. (Reference <br />appropriate report and page numbers and provide copies.) <br />Maturity of Project Concept/Coordination <br />"Extent to which agreement has been reached among all agencies and units <br />of government affected by the proposed project and/or which have approval <br />authority of project plans or mitigation of project Impacts. <br />We would appreciate your assistance In identifying the pertinent portion ?f your <br />Comprehensive Plan (and any other document - e.g. CIP) that ^"<^^cUes consistency <br />between the plan and the project. Please also provide a <br />section of the plan. Your letter of support, using the enclosed generic letter <br />as a starting point. Is also vital to being able to leverage County and c <br />funds with 80% federal funds. <br />HENNEPIN COUNTY <br />an equal opportunity employer
The URL can be used to link to this page
Your browser does not support the video tag.