My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-08-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
01-08-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2024 12:00:54 PM
Creation date
1/5/2024 11:59:21 AM
Metadata
Text box
ID:
1
Creator:
Christine Lusian
Created:
1/5/2024 11:59 AM
Modified:
1/5/2024 11:59 AM
Text:
https://legistarweb-production.s3.amazonaws.com/uploads/attachment/pdf/2358932/Fee_Estimate_-_2024_Sewer_Improvements.pdf
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No.: 9 Date: January 8, 2024 <br />Presenter: Adam Edwards <br />Presenter: City Administrator / Engineer <br />Section:Consent Agenda <br /> <br /> <br />Title: 2024 Sanitary Sewer Rehabilitation (CIPP) Design (24-014) <br /> <br />1.Purpose: <br />The purpose of this action item is to gain council approval to commence the planning and <br />engineering of the 2024 Sanitary Sewer Improvements Project. <br />2.Background: <br />Since 2005, MCES has identified Orono as one of the communities who contribute excessive <br />Inflow and Infiltration (I & I). The City has been executing a sanitary sewer rehabilitation project <br />annually to reduce I&I. Each year the City works to identify inflow and infiltration points within <br />the sanitary sewer system thought our annual inspection program. These inspections then inform <br />our rehabilitation efforts for the upcoming years. <br />3.Scope: <br />a. Project Scope of Work. This Sanitary Sewer Rehabilitation project will consist of Cured in <br />Place Pipe (CIPP) lining of infiltration susceptible sanitary sewer pipes. The purpose of the <br />project is to reduce Inflow and Infiltration (I&I) into the sanitary sewer systems and extend <br />the life to the existing pipes. <br />b. Design and Engineering Scopes of Work. Planning and engineering will consist of <br />reviewing televising, preparation of plans and specification and solicitation of bids. Proposal <br />at Exhibit A <br />4.Cost: <br />BMI provide a not to exceed cost of $ 24,900 for design work. <br />5.Funding: <br />The design and engineering as well as the construction of the project will come from the Sanitary <br />Sewer Fund. The 2024 CIP budgeted $300,000 for the project. The projected 2024 end of year <br />balance for the fund is $671,171. <br />6.Staff Recommendation: <br />I recommend approval of the proposals from Bolton and Menk and that Council authorize staff to <br />begin design and planning for these projects. <br />AGENDA ITEM <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />COUNCIL ACTION REQUESTED <br />Move to direct the City Engineer to move forward with planning for the 2024 Sanitary Sewer <br />Rehabilitation Project and accept the Bolton and Menk’s proposal for design and engineering of the <br />same. <br />Exhibits <br />A - Fee Estimate - 2024 Sewer Improvements.pdf <br />70
The URL can be used to link to this page
Your browser does not support the video tag.