Laserfiche WebLink
Scwer/Watcr Menu) <br />May 27, 1993 <br />Page 4 <br />If the Council finds that this lot is buildable. the sewer connection charge payable with <br />the building permit is as follows: <br />$ 225.00 - plant charge <br />191.50 - lift station by-pass charge <br />1.238.50 - lift station ftl force main charge <br />$1,655.00 total due with building permit <br />Brief Zoning Hislorj' <br />The "Casco Point District" was established in 1950, containing no regulations regarding <br />lot size for existing lots. Ordinance m adopted in 1959 established a minimum building lot <br />size of 1 acre area/140 ’ width, and allowed Council to grant variances for existing substandard <br />lots in single separate ownership. By not addressing common ownership lots, this section clearly <br />inferred that substandard lots in common ownership could not be granted variances. <br />The 1967 Zoning Code included the Casco Point area as "R-ID", requiring 1/2 acre area <br />and 100 ’ width. Those standards remained in affect when the designation was changed to LR- <br />IC in 1975. <br />Conclusion <br />Lot 18 has been assessed the footage charges that were assessed to all properties for the <br />1965 sewer and 1971 water projects. The lot was not assigned sewer or water units, based on <br />apparent determination of potential buildability based on codes in effect at the time. <br />Council is reminded that no variance review was conducted at the time of assessment to <br />determine actual buildability of the lot. <br />If the lot is detennined by Council to be buildable, sewer and water connections are <br />feasible although stubs are not in place and would have to be installed by the owner’s contractor. <br />Connection charges which would be due and payable at the time a building permit is issued <br />would be $1,877' for water and $1,655 for sewer (based on pennit issuance in 1993). <br />ch