Laserfiche WebLink
Scwer/Water Memo <br />Mav 27. 1993 <br />Page 2 <br />Water Assessment <br />Tlie following is a table defining how Lots 16 through 19 were assessed for water, <br />WATFR 1971 - LW-1 <br />Lot 16 <br />Plat 43300 <br />Parcel: <br />0500 <br />Assessed <br />6070 Units <br />Ownership as of 1974 <br />(earliest tax record available <br />Tuthill <br />Separate Tax Parcel <br />Lot 17 0550 5571 Unit Tuthill <br />Separate Tax Parcel <br />*Lot 18 0600 5570 Units Tuthill <br />Separate Tax Parcel <br />Lot 19 0650 5571 Unit Remien <br />Separate Tax Parcel <br />At the time City water was installed, all properties were assessed a tootage charge of <br />$5.80 per front foot (Lot 18 was assessed $319). Only those lots with existing residences or <br />those which were thought to be buildable were assessed a unit charge of $580 per unit. Staff <br />has found no documentation to-date as to the detail of this attempt to determine buildability of <br />vacant lots as part of this assessment; however, City Clerk Dorothy Hallin indicates that those <br />lots thought to be buildable were assessed a unit. <br />The placement of water stubs clearly reflected Mr. Tuthill’s common ownership of Lots <br />16-17-18. Only one stub was installed for the three lots, and "connector arrows" were placed <br />on the as-built drawing to reflect Tuthill’s ownership. <br />As it currently stands, a water unit has not been as.sessed to Lot 18. A water smb has <br />not been provided. Front footage has been paid. If the City determines that the lot is buildable, <br />the current water unit connection charge is $1,877 per unit which would have to be paid as part <br />of the buildin*’ permit. Further, the owner would have to pay all costs of connection to the <br />water main, which is across Casco Point Road from the lot. A new stub-in can be created <br />relatively easily by the owner s contractor. <br />Please see the water system as-built and copy of assessment roll attached.