Laserfiche WebLink
ROBERT H. OWENS <br />1700 Bohns Point Road <br />Wayzata, Minnesota 55391 <br />June 17. 1993 <br />Ms. Jeanne Mabusth <br />Building and Zoning Administrator <br />City of Orono <br />P.O. Box 66 <br />Crystal Day. Minnesota 55323 <br />RE: LAND USE APPLICATION OF MAY 27. 1993 <br />Dear Ms. Mabusth; <br />This letter will confirm our conversation concerning the status of final design details. <br />As covered in my letter to you on June 11. 1993. the lake shore bank design by our <br />engineer, GME Cons 'tants. was submittea to your engineer and to you last week. The <br />final Geogrid remforcemer* npsign was not finished pending soil test borings which have <br />now been completed. Fin^. ‘nn wiil be completed and sent by fax to your engineer <br />and yourself Friday, June 18. . 3. <br />As stated earlier, after this second failure of the bank, we have gone to considerable <br />expense to investigate and design a permanent repair. Our Consulting Engineers tell us <br />the combination of retaining walls and Geogrid fabric is the way to accomplish this. <br />Had I understood tn .equirement for a Land Use Application and not just a permit, this <br />process would h ' -e started months ago and the bank would already be restored. As <br />it now stands. I am very concerned the work is completed before more of the bank <br />collapses into the lake. <br />Please call me if you require anything further.