My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-14-1993 Council Packet
Orono
>
City Council
>
1993
>
06-14-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:36:46 PM
Creation date
12/29/2023 2:31:47 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO: <br />FROM: <br />DATE: <br />SUBJECT: <br />Mayor Callahan and Orono Council Members <br />Ron Moorse, City Administrator <br />Jeanne A. Mabusth. Building & Zoning Administrator <br />June 7. 1993 <br />#1820 Hennepin County Depanment of Environmental Management - <br />North Atm Access - Conditional Use Pemiit - Resolution <br />Brief Review of Application <br />At Council ’s April 12th meeting members voted to allow the County to proceed with the <br />necessary repair of the seawall at the Nonh Arm Landing subject to applicant filing a land use <br />application before the building permit is issued by the City. The land use application was filed <br />and a building permit has been issued. The majority of repairs have been completed. The work <br />commenced some time during the week of April 19th. Please review the enclosed packet of <br />information for a more detailed review of the proposal. <br />At the site inspection, staff and the City Engineer obsen ed vegetation and debris <br />collecting within the tliree curb cuts at the outer edges of the parking area that would eventually <br />drain directly into lake. Staffs real concern was for the invisible pollutants such as oils, <br />nutrients and other chemicals from vehicles that are Hushed into the lake with an initial down <br />pour. <br />The issue of water quality was never raised during the first review but has become a <br />major issue during the review for the repair of the seawall. The County representative. Denis <br />Bailey, concurs with the City ’s position and has agreed to submit a letter that would affirm that <br />the County will install a treatment facility prior to the boating season of 1994. As of the writing <br />of this memo, the City has yet to receive the letter but Mr. Bailey has advised that it will be <br />submitted in time for the Council meeting of June 14th. <br />Mr. Bailey advised that he has reviewed the City Engineer’s comments but feels it more <br />appropriate that the engineering staff of their Environmental Department be assigned the task <br />of designing a treatment facility that will be subject to the review of the City of Orono. <br />Planning Commission Recommendation <br />The Planning Ctnnmission recommended unanimous approval of the conditional use <br />pemiit for the Hennepin County Department of Environmental Management for repairs to a <br />section of a seawall at the North Arm access as shown on plans for Hennepin Coumy Project <br />No. 9209. sheet 2 of 2 by Wayne Shoo, a Registered Professional Engineer, dated May 6. 1992, <br />subject to the condition that a treatment facility for stonn water be iastalled priiir to the boating <br />season of 1994. Plans for the treatment facility are to be designed by the Environmental <br />Manaiiement Depanment and shall be reviewed by the Orono City stall at the time ol the <br />issuance of a building permit. The enclosed resolution been drafted to rellect the approval <br />of the Planning Commission.
The URL can be used to link to this page
Your browser does not support the video tag.