Laserfiche WebLink
Zoning File illlO <br />March 5, 1987 <br />Page 4 of 4 <br />3. Applicant must obtain a building permit for the installation of a <br />dock. A permit for the dock will not be issued until a certificate of <br />occupancy has been issued for new residence. <br />4. Applicant is placed on notice that the property is considered a <br />through lot and that future accessory structures will require a <br />conditional use permit and that these structures must meet a 50 feet <br />setback from both front/rear street setback lines. <br />5. Applicant must submit payment of fee for a conditional use permit <br />of $100.00 for proposed accessory structures on a through lot.