My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-16-1987 Planning Packet
Orono
>
Planning Commission
>
1987
>
03-16-1987 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 3:56:23 PM
Creation date
12/27/2023 3:53:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zdhing File #1117 <br />March 5, 1987 <br />Page 2 of 2 <br />The aoDlicant has advised that the soft, silt like bottom does not <br />provide adequate support for a boat lift. Dredging and f^l ng ^ ® ® <br />w<i-h crushed rock is not acceptable because of the need to consrancxy <br />maintain with dredging and filling. Although the City has no HH <br />the dredging of a lakebed, the environmental impact of this rustic <br />untouched shoreline area of Long Lake would present more concern. <br />Please note, Mr. Shull plans no superstructure fength"* <br />Tf ei-aff ^an correctlv recall# the boat is 21-23 feet in lengtn. <br />If Planning Commission members are able to get out to ' proposedfind no vilual impact created by the storage of the t-o-t at the proposed <br />looAt-inn The toDoqraphv of the bank# the existing vegetation and the <br />and surrounding residences. <br />Staff Recomniendation: <br />TO approve the variance application of Shull seeking lakeshore <br />Tp^^ltfani's^ r^/A'er/ -aUd^/t ^ <br />following findings: <br />1. The ramp and boat located within 20 feet of the <br />Take will have no negative impact on the lake views of the j <br />neighbors because of the existing topography# natural vegetation an <br />curve of the shoreline. <br />5 The existing lakebed does not provide adequate support for a boat <br />I'ift and bec\ule of the soft silt lakebed, mooring at a dock is not <br />acceptable because of constant damage to boat. <br />3. The alternative of dredging and filling ^*1®. wg* <br />environmentally sound nor is it practical in light of the need <br />continually to maintenance dredge. <br />The approval is subject to the following conditions: <br />1 The ramo structure may never be enclosed with a superstructure nor <br />s'canopy and any enlargement of the ramp must be approved by the City. <br />2. Applicant must obtain a building permit from the City of Oro o <br />prior to installation. <br />3. Applicant shall obtain the necessary Permits fro. the DNR to <br />install track section within lakebed of Long Lake. <br />%
The URL can be used to link to this page
Your browser does not support the video tag.