My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-24-1993 Council Minutes2
Orono
>
City Council
>
1993
>
05-24-1993 Council Minutes2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2023 12:12:45 PM
Creation date
12/26/2023 12:08:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />I <br />I <br />i <br />I <br />I.Expected Sewer lapro fits <br />Based upon the existing sewer facilities, the Metropolitan <br />interceptor capacity assigned to Orono, and the foregoing <br />alternative waste menagement studies, the following improvements <br />as shown on Map 3 are expected to be constructed in the period <br />1993-2010: <br />1. Highway 12 interceptor - construction of gravity or <br />forcenain interceptor to accoinnodate anticipated flows from <br />future development along Highway 12. Expected construction: <br />1994-1998. Possible options may include: <br />A. Construction of a gravity interceptor parallel to <br />and in addition to the existing Long Lak*.* bypass. <br />B. Replacement and enlargement of the existing Long <br />Lake bypass. <br />C. Rerouting of all flows from Medina and Orono from <br />the current connection to the Long Lake bypass, down <br />Old Crystal Bay Road to the Orono pump station. <br />2. Garden Lane - private developer extension of gravity <br />sewer laterals to serve 10-20 new residential units within <br />the MUSA. Expected construction year: 1995. <br />3. Baldur Park - private developer extension of gravity <br />sewer lateral service to serve four new residential units <br />within the MUSA. Expected construction year: 1995. <br />4. Highway 12 corridor - municipal lateral construction to <br />serve further institutional/commercial development expected <br />to occur within the Highway 12 corridor areas per <br />Comprehensive Plan Amendment #2 (1988). Expected <br />construction year: Ongoing 1993-2010. <br />V
The URL can be used to link to this page
Your browser does not support the video tag.