Laserfiche WebLink
3. <br />4. <br />S. <br />€. <br />7. <br />8. <br />9. <br />IV, <br />municipal sewer during or prior to the period 1980-1991. <br />This revision also incorporates MUSA line amendments adopted <br />by the City since 1980 and which have received Metropolitan <br />Council approval. <br />Changes since 1980 to metropolitan sewer facilities and to <br />Orono's municipal sewer facilities are detailed. <br />Changes in the numbers and characteristics of on-site sewage <br />treatment systems In the City since 1980 are documented. <br />The amendment updates forecasts of sewered and unsewered <br />development within the City. <br />The amendment indicates minor revisions in the City's <br />ordinances dealing with on-site sewage treatment systems, <br />resulting in even greater control over the design, location, <br />installation, and operation of on-site sewage treatment <br />sy stms • <br />The amendment demonstrates that Orono's current controls <br />ov.r ..ptlc syatois «.t or »xc—i the M.tropolltw. Council <br />requirements for allowing rural densities in excess of 4 <br />units per 40 acres. <br />Th. Clty'n plan ot .ction to reduce inflOM and Infiltration <br />probleaa within eaiating City aewage facilitiea in <br />described. <br />The amendment reiterates that Orono's C.S.P.P. is consistent <br />with metropolitan planning goals. <br />h. <br />program. <br />Orono's urban and rural areas continue to provide distinctly <br />different lifestyles, amenities and services. Orono as <br />,J <br />J <br />J <br />I <br />I <br />I <br />I <br />I <br />.1