My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-17-1988 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1980-1989
>
1988 Planning Packets
>
10-17-1988 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 11:09:55 AM
Creation date
12/20/2023 4:15:52 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iL.'_________t,,: <br />this review shall be <br />pair of the road and to <br />road.In addition,the <br />itorm of the summer of <br />ing the filing of land <br />is staff's hope that a <br />residents rather than <br />a City.Staff has been <br />,r cannot be delayed by <br />’the residents.It is <br />possibly sometime in <br />i,Glenn Cook will be <br />>r Planning Commission <br />s for the road.Staff <br />egarding the design <br />advised that this was <br />:y sketch provided Mr. <br />and for preliminary <br />k:of specific questions <br />as follows? <br />the ground? <br />f filling lakeward of <br />exposed to make more <br />by the applicants and <br />to discuss methods to <br />and how the proposed <br />tions. <br />tions pertaining to the <br />ad and to receive any <br />e who have opinions on <br />ners served by Crystal <br />on them,and 1 has a <br />1 basis to repair the <br />i review packets. <br />r <br />**1 <br />V.; 'V':■ 'eP/''■ .'P; <br />Zoning Pile #1302 <br />October 12, 1988 <br />Page 4 of 4 <br />Staff Recommendation - <br />Staff recommends approval of the conditional use permit and viriar <br />application of the City of Orono that would allow approximately 200*f line <br />feet of the roadbed of Crystal Bay Road to be restored to a safe ccnditi <br />for use by the public, subject to the following conditions; <br />1.The City shall provide appropriate erosion control throucf^iolit t <br />entire project. <br />2.All work shall be performed within the public road ea&iment <br />Crystal Bay Road. <br />3.If the City finds it necessary to close off this sectio ^ of ro <br />during repair, the City must provide adequate warning and aLterna <br />access when necessary, <br />4.The guardrails installed as a part of the restorati*\ of t <br />roadbed shall be removed as soon as the adjacent lakeshore anks a <br />restored.
The URL can be used to link to this page
Your browser does not support the video tag.