Laserfiche WebLink
ccess corridor, <br />school district <br />and type of road <br />no formal plans <br />3sslbly playing <br />on that the road <br />t level of the <br />e chain of title <br />need to install <br />if one of these <br />road should be <br />^ine and develop <br />Agreement. The <br />5ted at the time <br />requirement that <br />:he time of the <br />>uld also be set <br />us standard and <br />Line. All lots <br />ring additional <br />pending upon the <br />inal ownership <br />»d to the north <br />latting of this <br />were made, and <br />or topographic <br />linutes, it was <br />for topographic <br />outlet and sees <br />iriew. <br />er of the board <br />urrent plan and <br />will be needed <br />ceed 5 acres of <br />It the time of <br />Smm. <br />Zoning File #1321 <br />September 2, 1988 <br />Page 3 of 4 <br />district should be placed on notice i <br />staff Itspnamw nJation - <br />flndln, all <br />insura^lnattlla'tlon'nf"!"# be executed by the developer toxnsure installation of a future road that must meeti all <br />engineering standards of the City at the time of construction The <br />thit ^will SddrMf*?h« restrictions/covenants within that agreement mat will address the following concerns of the City: <br />A) Development or use of either one of the four lots shall <br />require the installation of the through rLd from tha <br />Intersection of Old Crystal Bay Road to the east border of Outlot <br />reoardinc1-hI®i?^*v provide some clarification language <br />fctlvltiL^««*.^^4®^ school for play fields or other <br />involving structural improvements. It should be <br />fields must be via the approved <br />City Engineer shall define a standard of minimum <br />improvement for the temporary access road to the play field. <br />^ formula should be established providing guidelines for the <br />share in the cost in the total upgrading of Outlot A. <br />Should also advise future owners that at the <br />time road plans are submitted, additional fees will be required <br />letter^o?'"'' posted with the City in the forS of a <br />credit to assure that road is completed to required <br />sfsndards. How shall these costs be shared? <br />?'® amount of $400.00 ($100.00 per each <br />park-fee at tMrie"ve?TdVvX"^^^ <br />reaulred*^j^<? 4.^^® engineering plans for road usuallyequired at the time of a subdivision application# because of <br />fac^thlV't'hlf^'n"''®®! this subdivision application and thefact that the Developer's Agreement will address the need for fA« <br />appropriate security to insure completion of road at the <br />txme development pressures require construction road in the future! <br />• -!-1 <br />:x; <br />■".'V <br />i ’•> <br />■ :•! *>. ‘1 <br />: ^ '.J: <br />tb <br />Zoning File <br />Septei^er 2, <br />Page 4 of 4 <br />4. AIJ <br />additic <br />County <br />to be f <br />5. The <br />of Outl <br />has pro' <br />i Ji r it