Laserfiche WebLink
r-^y V;->^4p3ji'-■:'/Z^.y[ <br />nistrator <br />oad - <br />eat to Reschedule <br />of Amended Application <br />itiguous area required. <br />of four lota <br />review, the owner's <br />icerns of the City with <br />ig their request for a <br />d have allowed them to <br />criptions. The school <br />ibility to insure the <br />the disposition of the <br />sd to re~schedule the <br />asks for consideration <br />with an interior access <br />B site to confirm the <br />»e intersection of Old <br />1 the safety standards <br />pment plans for Area 3 <br />osed in your previous <br />s consistent with the <br />pears to be the most <br />■h <br />."£| <br />hr;P-. <br />• f .m <br />W- 'S-r- <br />f <br />M <br />iff?™ <br />m..r- ■•••V.. V ," ■ • > i;. .mmrnSm^ <br />Zoning File #1321 <br />September 2, 1988 <br />Page 2 of 4 <br />All access to these lots must be via the approved access corridor, <br />thl« interim period. As there are no formal plans <br />?fr?A^ ‘•y the school, except for possibly pliying <br />* lots, advising any future owner of the need to install <br />1- engineering standards of the City if one of these <br />the road should be <br />‘ l^d® »'»Jx*ivider's responsibility to define and develop <br />citv language within the Developer's Agreement, The <br />y must require assurance that the road would be constructed at the time <br />«noln»«T*4 (for the City is being asked to waive the requirement that <br />n?lll»ln/rv^/ii^^ ^®®* ^® ®t the time of the4?*fu “®®** plans and review fees should also be setforth in the Developer's Agreement. <br />Review of RR-lB Standards - <br />200 ®®^® contiguous standard and <br />^®*^ ^^® setback line. All lotscan be served in the future by an Interior road not requiring additional <br />Vi ^‘’^4* review. In review of the minutes,’it'^wasnoted that a Planning Commission Member suggested the need for topographic <br />information. Staff has reviewed the location of the road outlot and sees <br />no need for topographic information at this point of the review. <br />The school district has advised the staff that a member of the board <br />has been in contact with each member and has discussed the current plan and <br />trcOTpletr?hifVe°vievJ:*'“^ "dditlonal information will be needed <br />The septic testing has been waived as the lots all exceed 5 acres of <br />dry buildable area. Septic testing will be required at the time of <br />development of each of the four lots. <br />Zoni] <br />Sept( <br />Page <br />loca <br />rece. <br />issu€ <br />The i <br />acqui <br />to th <br />stand <br />subdi <br />folic <br />2. <br />li <br />P« <br />3. <br />r€ <br />un <br />fa <br />pa <br />ti