My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-18-1988 Planning Packet
Orono
>
Planning Commission
>
1988
>
07-18-1988 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 8:40:13 AM
Creation date
12/13/2023 1:31:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
vf <br />■f <br />> l( <br />' Id <br />k <br />'* r':' <br />- * a <br />#' ' <br />'V <br />i ■ <br />McCnipoiltaii Control CnrainlNWksnWma iWt C mpc , 2X> Eaii F*^ Swrt. In IM. ha —tjo 55mJttM 23. Iftt #130 «I2^-941S <br />J#«nn« Ha^ith <br />Sonir»9 Adteiniatrator <br />City of Orono <br />r. O. Box 66 <br />Crystal Bay. HR 5S333 <br />lUii Orooo iQtcrcsptor lomrcsveMnts <br />MCC Project Ctoaber BS^iT <br />Subject: Conditional Use Petalt/Varimee Applicati^ <br />and Supporting Inforaatiofi <br />ll^ar Ms. Mabostht <br />Enclosed please find the coaipleted applicaticm. relevant plans, half <br />section aap. staaped envelopes, photocopy of previously subaitted <br />notification list, and surveys for the referenced project. This infor <br />mation per*^alns specifically to lift station L44 near Maavell Bay <br />Narine which was revised after the original permit application for <br />this project was approved by the City of Orono. <br />The MWCC and its consultant for the project. Bonestroo. Roeene. <br />Anderlik. and Associates. puraueJ all other options pertaining to the <br />relocation of this lift station. Finally, on April 27. 1988 a meeting <br />was held with Mr. Jerry Toberaan. %rho is in the process of acquiring <br />the property by contract for deed from Rita M. Straley (see attached <br />5/6/88 letter and 5/11/88 aemorandum). With future business develop <br />ment in mind. Mr. Toberman asked that we locate the lift station in <br />the farthest southwest corner, as represented on the revised plan <br />sheets and surveys. <br />It would be detriokental to the necessary project schedule if this <br />proposed design is not accepted by the City of Orono. Therefore, the <br />MWCC appreciates your thoughtful considerations of the issues at hand <br />while reviewing this application. <br />If you have any questions or require additional Inforaation, please <br />contact the Project Manager. Kimberly Eckhardt, at our office at <br />229-2170. <br />Assistant Director, Engineering <br />CRP:KBE:sma <br />KBE-L50 <br />^ ml/Enclosures Dli Vt^rfs <br />I <) 7 ^ . 1 o o <br />J <br />% f <br />.■*
The URL can be used to link to this page
Your browser does not support the video tag.