My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-1994 Council Packet
Orono
>
City Council
>
1994
>
12-12-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 1:07:04 PM
Creation date
12/11/2023 1:02:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
minutes of thu regular orono city council <br />MEETING HELD ON NOVEMBER 28, 19*>4 <br />(•#7) #1969 CITY OF ORONO, 1355 BROWN ROAD SOUTH - VARIANCE - <br />RESOLUTION #3500 <br />Jabbour moved, Kelley seconded, to adopt Resohilion #3500 approving a variance to the <br />front setback requirement to enable the construction of a parking lot to serve the Crystal <br />Bay Post Office. Ayes 4, Nays 0. <br />(#S) B-2 ORDINANCE PROPOSED AMENDMENT <br />Callahan moved, Kell^ seconded, to table the amendment to the December 12,1994 <br />meeting of the Council. Ayes 4, Nays 0. <br />MAYOR/COUNCIL REPORT <br />CaUahan suggested a work session on Highway 12 Planning be scheduled for 8:00 a m. <br />on December 6. 1994. The Council members agreed to meet on that date. <br />Hurr entered mlo the record a letter written by Hurr voicing her concern ^h the <br />decision to c»‘ange the Council meeting times without the item being on the agenda and <br />without her presence. <br />The time of the Council meetings will be re-considered when all members are present. <br />ENGINEER REPORT <br />Glen Cook had no coounems. <br />CITY ADMINISTRATOR’S REPORT <br />(#9) OLD CRYSTAL BAY ROAD BIKE/HIKE TRAIL <br />Moorse updated the Council on where the bike trail plan is at the pre^t time. The <br />Council was provided with a re-drafted agreement with Hennepin Par^ and outhned <br />changes Staff is looking for authorization from the Counal to formaliM the a^eemenL <br />and allow Staff to prepare bid specifications and advertise for bids on the first phase of <br />construction of the bike trail. <br />Callahan asked for clarification on what the County will pay.
The URL can be used to link to this page
Your browser does not support the video tag.