My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-26-1994 Council Packet
Orono
>
City Council
>
1994
>
09-26-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 11:15:47 AM
Creation date
12/11/2023 11:12:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Orono Public <br />Works Department <br />Project No. CMKX-93-0I63 <br />September 14, 1994 <br />Page 4 <br />Chemical Soil Sampling <br />The soil sample will be collected from the depth imerv^ exhibiting the highest PID reading <br />and directly above the water table in each of the borings by an environmental geologist for <br />chemical dialysis. <br />Chemical Groundwater Sampling <br />Groundwatff samples will be collected by an environmental geologist using clean, VOA glass, <br />SCTew-top vials with Teflon*-lined caps, labeled, and transported to our laboratory under <br />refrigerated conditions using Braun Intertec chain-of-custody procedures. <br />Chemical Analysis <br />All analyses are performed using EPA or other recognized standard procedures. Data will be <br />reviewed prior to release. Specific information on standard operating procedures, detection <br />limits, and quality control measures is available upon request. <br />i <br />E. Cost Estimate <br />Listed below are the total project cost estimates for the anticipated work at the site. <br />Cost Estimate <br />Service Description <br />Consulting Services <br />Drilling Services <br />Laboratory Services <br />Project Total <br />Cost Estimate <br />$8,213.00 <br />1,393.00 <br />2.696JX) <br />$12,302.00 <br />The actual costs may be more or less than the estimate above; however, the total cost will not <br />be exceeded by more than 10 percent witl.out your additional authorization. <br />Costs presented in this work plan are based on the scope of work and assumptions stated <br />above. If additional work or personnel are required, costs will be added based on an hourly <br />or unit cost basis in accordance with our first proposal dated June 9, 1993. Costs presented <br />in this proposal are under the same unit pricing as the previous bids. <br />Costs included in this work plan are based op the assumption that the work plan will be <br />authorized within 30 days. If the project is not authorized within 30 days, we reserve the
The URL can be used to link to this page
Your browser does not support the video tag.