Laserfiche WebLink
r <br />heavy duty <br />\RY 1990 <br />Wl <br />» in «4U«r* fMt) <br />30" I <br />tapered <br />section <br />$670.00 <br />fey <br />30 <br />straight <br />section <br />$570.00 <br />a <br />' (1 3' <br />i <br />B-30 <br />BASE <br />r ■$212-57 <br />Flat Roof Mounts <br />RFM - 30 - $186.52 <br />For Guyed Towers <br />bearing $90.70 <br />1-5/8" SC <br />$116.52 <br />2-3/16"SC 4-B <br />Hole for the B-30 Tower, “ deep, <br />with 6 cu. yd. concrete. The B-30 base <br />should be bolted to the <br />section of your P^^^^cular configu <br />This will insure correctspread of base. While concrete is ^ettin <br />up, base can be- ^ usedenters level on the upright section used <br />to keep the base spread.Allow concrete 3 to 4 days to set up, <br />before erecting balance of tower._ _ _ __ <br />WOTi: AM *K«uld ba put in aiwunt »f canctf <br />TOP PLATE <br />Flange Bearing <br />Mount- $21.24 <br />This plate to <br />be WELDED to <br />Top Section, <br />(as shown below)