Laserfiche WebLink
r 1UNIVERSAL TOWERS SECTIONAL DESIGNATIONS <br />Univcnai Aluminum Tower Sections arc 10 feet in lenfth and are an etyuiiateral triangular welded mm. <br />dcsifnattd as 11". 14" ir'. 22" and 26". <br />They are <br />TYPICAL ASSEMBLY STRAIGHT SECTION <br />TOP SECTION m <br />STRAIGHT SECTION <br />Wt-13^ ... H” Top $113.66 <br />Wt-14-* ... 14” Top $143.22 <br />Wt-31^ ... 18” Top $259.72 <br />Wt-13^ ... 14” Taper $126.00 <br />Wt.-29* ... 18" Taper $226.00 <br />Wt-34* ... 22” Taper $337.00 <br />... 26” Taper $453.00 <br />Wt-12<'... 11” Straight $112.00 <br />Wt.-13^ ... 14” Straight $126.00 <br />Wt.-29* ... 18” Straight $226.00 <br />Wt.-34<^ ... 22” Straight $337.00 <br />Wt.-47'^ ... 26” Straight $453 00 <br />B 14 <br />B-18 <br />B22 <br />B-26 <br />BASES <br />approximately Vi cu. yd. concrete <br />1-% cu. yd. concrete — (Hole 3' x 3' x 4' deep) <br />2 cu. yd. concrete - Hole (4' x 4' x 4* deep) <br />4 cu. yd. concrete — Hole (4-!4* x 4 *A' x 5 ’ deep) <br />The B-18 . B-22 and B-26 should be bolted to the bottom tower section of <br />your particular configuration. Th*s will insure correct equilateral spread of the <br />base. While concrete is setting up, base can be leveled by using a carpenters level <br />on the upright of the section used to keep the base spread. Concrete should be <br />allowed set up for 3 to 4 days before erecting remainder of tower. <br />NOTE: All boses should be put in omount el concrete recommended. <br />CAUTION DO NOT VOID YOUR WARRANTY <br />Aluminum Tower sections should NEVER be placed directly in concrete" Corrosive effects of cement will DESTROY <br />alumjnum tower sections. Use only Universal Bases as shown. Tower sections also require drainage to mimmife the <br />possibility of freezing ana splitting. Universal bases allow the tower to dram properly and obviate the possibility of damage. <br />Use of an Universal Tower without the proper base VOIDS ALL WARRANTIES.